BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 11, 2024 at 8:00 PM

Updated May 15, 2024

Demolition, site work and new construction of a water / sewer project in Mesquite, Texas. Completed plans call for the demolition of a water / sewer project; for the construction of a water / sewer project; and for site work for a water / sewer project.

ECS Project No. 19:9028 Construction of a new Headworks facility and Peak Wet Weather Flow Storage Basin at the South Mesquite Creek Regional Wastewater Treatment Facility for North Texas Municipal Water District. Detailed scope of work is included in the bid package documents but contains at a minimum: -Construction of a new Headworks -Screens Facility -Screening and Grit Handling Facilities -Container Area -Grit Removal Chambers and Grit Pump Basement -Electrical Building and Electrical Room -Multiple Odor Control Facilities -Modifications to Existing Structures -Varying sizes of yard piping, both gravity and force mains -Start-up, Training, and Commissioning of the Project It shall be each Proposer's sole responsibility to inspect the site of the work regarding the local conditions under which the work is to be done. It shall be understood and agreed that all such factors have been thoroughly investigated and considered in the preparation of the proposal submitted. Question Deadline 05/11/2024 at 2:00 PM CT The deadline to ask questionsConstruction of a new Headworks facility and Peak Wet Weather Flow Storage Basin at the South Mesquite Creek Regional Wastewater Treatment Facility for North Texas Municipal Water District. Detailed scope of work is included in the bid package documents but contains at a minimum: -Construction of a new Headworks -Screens Facility -Screening and Grit Handling Facilities -Container Area -Grit Removal Chambers and Grit Pump Basement -Electrical Building and Electrical Room -Multiple Odor Control Facilities -Modifications to Existing Structures -Varying sizes of yard piping, both gravity and force mains -Start-up, Training, and Commissioning of the Project It shall be each Proposer's sole responsibility to inspect the site of the work regarding the local conditions under which the work is to be done. It shall be understood and agreed that all such factors have been thoroughly investigated and considered in the preparation of the proposal submitted. Question Deadline 05/11/2024 at 2:00 PM CT The deadline to ask questions The deadline to ask questions All questions about the meaning or intent of the Contract Documents shall be posted to CivCast at least 72 hours prior to the scheduled proposal opening

Post-Bid

Water / Sewer

$92,500,000.00

Public - City

Demolition, New Construction, Site Work

411

53

70

7

Subscribe For Documents

46 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
354
Active Projects
46
Bidding Soon
4,135
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 14, 2024

July 8, 2024

Project location map

3500 Lawson Rd, Mesquite, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.