Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 23, 2024 at 8:00 PM
Updated May 24, 2024
Renovation of a fire / police facility in Medford, Massachusetts. Completed plans call for the renovation of a fire / police facility.
Medford Barracks Roof Replacement and Envelope Repairs. Estimated Cost $1,123,171 Prevailing wage rates apply on the project in accordance with M.G.L. c. 149, 26 & 27. Category of Work: General Contracting. This project is scheduled for 180 calendar days to substantial completion and in general includes: Scope of work for the project consists of removal and replacement of approximately 6,400 square feet of roofing on four roof areas, replacing a concrete chimney cap, roof monitor siding and soffit replacement, minor masonry repairs, replacement of the cast in place concrete entry ramp and toilet room renovations for accessibility. The General Contractor shall be held directly responsible for the correct installation of all work performed under this Contract. The General Contractor must make good repair, without expense to the Massachusetts State Police, of any part of the new work, or existing work to remain, which may become inoperative on account of leaving the work unprotected or unsupervised during construction the system or which may break or give out in any manner by reason of poor workmanship, defective materials or any lack of space to allow for expansion and contraction of the work during the General Contractor's warranty period, from the date of final acceptance of the work by the Massachusetts State Police. The Minority Business Enterprise participation goal for this Contract is _7.4%. The Women Business Enterprise participation goal for this Contract is _4.0%. The applicable minority workforce utilization percentage, if any, is __5.0% The applicable women workforce utilization percentage, if any, is __5.0% Work will commence on site on or about June 1, 2024 and be substantially complete by October 25, 2024.
Award
Fire / Police
$786,900.00
Public - State/Provincial
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 2, 2024
June 1, 2024
520 Fellsway, Medford, MA
Related To This Project
Medford, MA
Bid Date: Aug 28 2024
Medford, MA
Bid Date: May 29 2024
Medford, MA
Bid Date: Jun 20 2024
Medford, MA
Bid Date: Jun 20 2024
Medford, MA
Bid Date: Jun 28 2024
Medford, MA
Bid Date: Jun 27 2024
Medford, MA
Bid Date: Aug 13 2024
Medford, MA
Bid Date: Apr 25 2024
Medford, MA
Bid Date: Apr 10 2024
Medford, MA
Bid Date: Apr 18 2024
Medford, MA
Bid Date: Apr 11 2024
Medford, MA
Bid Date: Jun 30 2024
Medford, MA
Bid Date: Apr 04 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
