EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 25, 2024 at 8:00 PM

Updated April 17, 2025

Site work, paving and outdoor lighting for a mixed-use development in Oneonta, New York. Completed plans call for site work for a transportation facility; for outdoor lighting for a transportation facility; for paving for a transportation facility; water / sewer project; and water / sewer project.

FAA AIP No. 3-36-0092-029-2023 (DESIGN) FAA AIP No. 3-36-0092-0XX-2024 (CONSTRUCTION) Question Deadline 04/21/2024 PROJECT DESCRIPTION The Project consists of the removal of all obstructing vegetation on the Albert S. Nader Regional Airport property. The obstructions are located on approximately 5 acres in the vicinity of the Runway 6 threshold and approximately 8 acres in the vicinity of the Runway 24 threshold and are on Airport Property. A 3/4 acre area abutting a neighboring on the Runway 6 end will be topped at an elevation 10 feet below the Part 77 surface as indicated on the plans. The proposed project will be performed by the IUA, with grant assistance from the Federal Aviation Administration (FAA) Airport Improvement Program (AIP) and the New York State Department of Transportation (NYSDOT). The project will be bid as a Base Bid and Add Alt, with the Runway 6 end being the Base and the Runway 24 end being the Add. 3. COORDINATION BEFORE AND DURING CONSTRUCTION Safety considerations are paramount during airfield construction projects. Careful planning, scheduling, and coordination of construction activities before and during construction can minimize disruption of normal aircraft operations and avoid situations that compromise the airport's operational safety. A complete list of the project contacts, including local emergency responders, has been included in Appendix A. The Contractor will be provided an electronic copy of this list and will update it to include contact information for its staff and sub-contractors including their Construction Safety Officer. The updated list will be included in an appendix of the Contractor's Safety Plan Compliance Document (SPCD).

Award

Transportation Terminals

$880,880.00

Public - City

Outdoor Lighting, Paving, Site Work

19

14

2

4

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Temporary Utilities, Temporary Water, Construction Facilities, Sanitary Facilities, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Closeout Submittals, Bonds, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 08 - Openings

Division 08 - Openings

Windows
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Traffic Signage
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Loading Dock Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Bedroom Furnishings, Blankets, Furniture, Multiple Seating
Division 26 - Electrical

Division 26 - Electrical

Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Fertilizing, Bases, Ballasts, and Paving, Paving Specialties, Pavement Markings, Planting, Planting Preparation, Soil Preparation, Turf and Grasses, Seeding, Plants, Trees
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
185
Active Projects
131
Bidding Soon
1,560
All Active Projects
700
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 2, 2024

June 3, 2024

img_map_placeholder

391 Airport Rd, Oneonta, NY

Find. Bid. Win. Your Next Project Starts Here.

Get the right
data with Project Intelligence

Share with your network.

Albert S. Nader Regional Airport - Replace and Relocate Automated Weather Observation System

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.