BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 19, 2024 at 8:00 PM

Updated April 20, 2024

Site work for a civil project in Belton, Missouri. Completed plans call for site work for a water / sewer project.

Six (6) groundwater monitoring wells located at the former City of Belton Public Works Facility require permanent closure. The site is located at 1201 Street Barn Lane in Belton, Cass County, Missouri and is approximately 23 acres of land that was developed by the City of Belton as a City maintenance and storage lot. The Missouri Department of Natural Resources (MDNR) issued a No Further Action (NFA) letter dated September 2022 with limitations after the City filed a Restrictive Covenant on the property deed. The NFA and Restrictive Covenant were associated with the removal of former onsite Underground Storage Tanks (USTs). The six (6) groundwater monitoring wells each are 14 feet in depth and require closure to complete the Citys requirements. The Public Works Department reserves the right to reject any or all bids not deemed acceptable.

Post-Bid

Water / Sewer

$400,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
182
Active Projects
110
Bidding Soon
1,220
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 18, 2024

May 20, 2024

Project location map

1201 Street Barn Ln, Belton, MO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.