Site work for a water / sewer project in Belton, Missouri. Completed plans call for site work for a water / sewer project.

This project involves sealing sanitary sewer manholes and pipe to eliminate known inflow and infiltration issues within the City's sanitary sewer system. The work will be located in West Belton. Specific manhole and pipe locations will be provided by the City to the Contractor once they are determined. The contractor must include with the proposal the method they propose to seal each item. Proposals will be reviewed for price, materials and length of repair. Question Deadline 07/23/2024 All questions regarding the bidding of this project must be submitted to Kaleb Young, Engineer I, City of Belton, by phone at 816-489-0222 or by email at kyoung@belton.org. All questions must be received (3) days prior to the bid opening. All equipment, materials, labor, and workmanship must be in accordance with the Specifications and other Contract Documents. Requests for information related to this RFP should be directed to: Kaleb Young, Engineer I Telephone: 816-489 0222 E-Mail: kyoung@belton.org The decision as to the correct time for the openings shall be made by the Assistant City Manager/Public Works Director of the City of Belton and that decision shall be final. Proposals received after the deadline date and time will be returned unopened. It shall be the responsibility of those submitting a proposal to assure themselves that their proposal has been received by the City of Belton. All bids must be accompanied by a Bid Bond from a surety or certified check from a bank acceptable to the Assistant City Manager/Public Works Director in the amount equal to or greater than 5% of the maximum total bid price. Prior acceptability of the proposed surety or bank furnishing the bid security before the bid date is recommended. An unacceptable bid security may be cause for rejection of the proposal. No bidder may withdraw his bid for a period of sixty (60) days after the date of opening of bids. Contractor shall provide a ten (10) hour Occupational Safety and Health Administration (OSHA) construction safety program for all employees who will be on-site at the project. The construction safety program shall include a course in construction safety and health that is approved by OSHA, or a similar program approved by the Missouri Department of Labor and Industrial Relations that is at least as stringent as an approved OSHA program as required by Section 292.675, RSMo. All wages paid for work under this contract shall comply with the requirements of the prevailing wage law of the State of Missouri, Missouri Public Law 294, Sec. 290.210 through 290.340, RSMo 1969, as amended. Pursuant to 610.021 RSMo Item 12, all documents within a request for proposal will become open record to the public upon a negotiated contract being executed. All documents within a request for bid become open record as soon as the bid is opened. Bidders and proposers should be aware that all documents within a submittal will become open records. The Owner reserves the right to reject any or all proposals and to waive informalities or deficiencies therein to negotiate with any or all bidders or others for more favorable terms or prices and to award a contract to other than the bidder submitting the lowest cost bid proposal with or without negotiation and to determine which is the lowest, best, and most responsive to accept, at its option, any alternates and to approve the bond.

Award

Water / Sewer

$691,275.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
59
Active Projects
30
Bidding Soon
714
All Active Projects
300
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 2, 2024

September 2, 2024

img_map_placeholder

Multiple Locations, Belton, MO

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.