Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 16, 2024 at 8:00 PM

Updated September 17, 2024

Site work and new construction of a municipal facility in Belton, Missouri. Working plans call for the construction of a municipal facility; and for site work for a municipal facility.

The City of Belton Public Works Facility, Building A, located at 700 Seabee Road, Belton, Missouri, 64012. The City of Belton is seeking proposals from qualified vendors to provide building materials and building assembly for a structural breezeway between two existing buildings. Proposal Items: Building: One (1) 10' x 20' single slope structural steel building with 2:12 pitch and all steel secondary framing Dimensions: 10 feet width (north to south) x 20 feet length (west to east - existing building to existing building) Building materials to include all steel framing, sheet metal, clips, etc. Two (2) walk doors with windows, steel jambs, and locking knob sets included 3" vinyl-backed, fiberglass insulation (R-10) and installation into building Provide, hang, and finish 1/2" drywall on new walls and ceiling (excludes priming and painting or any work on existing building) Missouri-Stamped Engineered Building Drawings included Excludes electrical Excludes concrete other than grouting

Final Planning

Municipal

$15,000.00

Public - City

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
170
Active Projects
56
Bidding Soon
1,369
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 9, 2024

October 9, 2024

Project location map

700 Seabee Rd, Belton, MO

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed