Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Demolition, site work, paving and new construction of a bridge / tunnel in Wheaton, Illinois. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
The project consists of the replacement of the wooden decking and railings and the cleaning and painting of the steel substructure of the existing bridge over the West Branch of the DuPage River in Mallard Lake Forest Preserves. Consideration of contract award will likely be made on May 16, 2024 Minority business firms are encouraged to submit bids on the project and successful contract bidders are encouraged to utilize minority businesses as subcontractors for supplies, equipment, services and construction. The Forest Preserve Commission reserves the right to reject any or all bids and to waive technicalities. Bid Bond 10% Deadline for Questions / Request for Information 4/29/2024 5:00 p.m. Via e-mail to: cwelch@dupageforest.org Or phone 630-871-6411 SUBSTANTIAL COMPLETION It is anticipated that the CONTRACTOR will begin Work June 30, 2024 and the project shall be substantially completed by August 30, 2024. Substantial completion shall consist of completing all Work under Contract. Within 7 days after the date of substantial completion, the Owner will furnish the Contractor with a punch list specifying the items that need to be completed or corrected. The Contractor shall complete all items on the punch list by September 20, 2024, or within such time as may be allowed by extensions approved by the Owner. Unless approved by the Owner, a time extension will not be given due to weather unless the Contractor submits a claim in writing showing documentation from the National Weather Service that the weather during the contract time was unusually severe versus the previous ten (10) years recorded. FINAL COMPLETION Contractor shall complete all the items on or before Final Completion date of September 27, 2024
Bid Results
Bridges / Tunnels
$358,200.00
Public - County
Demolition, New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 3, 2024
June 30, 2024
To Be Determined, Wheaton, IL
Related To This Project
Wheaton, IL
--
Wheaton, IL
--
Wheaton, IL
Bid Date: May 01 2024
Wheaton, IL
Bid Date: May 15 2024
Wheaton, IL
Bid Date: May 14 2024
Wheaton, IL
Bid Date: May 16 2024
Wheaton, IL
Bid Date: May 13 2024
Wheaton, IL
Bid Date: May 20 2024
Wheaton, IL
Bid Date: Apr 23 2024
Wheaton, IL
Bid Date: Apr 15 2024
Wheaton, IL
Bid Date: Apr 24 2024
Wheaton, IL
Bid Date: Apr 26 2024
Wheaton, IL
Bid Date: Apr 09 2024
Wheaton, IL
Bid Date: Apr 09 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.