Published May 17, 2024 at 8:00 PM

Updated October 1, 2024

Demolition, site work, paving and new construction of a bridge / tunnel in Warrenville, Illinois. Working plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

**As of May 17, 2024, bids received were rejected. No definite date for the rebid.** The work to be done for this project, shown on the Drawings entitled, Cenacle trail Bridge Rehabilitation prepared by Engineering resource Associates dated April 9, 2024, consists of a complete deck replacement, a partial substructure replacement with cleaning and painting of existing steel to be left in place and abutment repair of the existing bridge over the West Branch of the Dupage River in Blackwell Forest Preserve. Bid Bond 10% Consideration of contract award will likely be made on May 16, 2024 Minority business firms are encouraged to submit bids on the project and successful contract bidders are encouraged to utilize minority businesses as subcontractors for supplies, equipment, services and construction. The Forest Preserve Commission reserves the right to reject any or all bids and to waive technicalities. Question Deadline 04/29/2024 at 5:00 PM CT REQUIREMENTS INCLUDE A. Removal of existing timber deck and railings B. Rehabilitation of existing substructure a. Replacement of select timber members b. Cleaning and painting of existing steel members C. Repair of footings and support structures a. Repair of masonry footings b. Replacement of wingwalls D. Installation of new decking and railings Contractor Use of the Premises A. Contractor shall not block the driveway or parking lot. B. Do not load structures with weight that will endanger any structure. C. It shall be the responsibility of the Contractor to see that all applicable OSHA standards and safety procedures are followed. D. Any damaged property shall be repaired by the Contractor to the satisfaction of the Owner and returned to the same condition it was in prior to the Contract starting date. E. The Contractor shall assume full responsibility for protection and safekeeping of products stored on premises. F. The Contractor shall not interrupt Forest Preserve operations. The trail shall be closed to the public for the duration of the project from the east side of the bridge to the project limits. G. Contractor shall prohibit the lighting of fires about the premises and use due diligence to see that such prohibition is enforced. Debris and waste materials shall not be burned at the site but shall be promptly removed to prevent the accumulation of combustibles on the site.

Final Planning

Bridges / Tunnels

$1,224,351.00

Public - County

Demolition, New Construction, Paving, Site Work

29

11

2

2

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, References, Reference Standards, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Construction Layout, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Bonds
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Facility Remediation, Transportation and Disposal of Hazardous Materials
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing
Division 04 - Masonry

Division 04 - Masonry

Masonry, Maintenance of Masonry, Stone Cleaning, Stone Restoration, Unit Masonry, Clay Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing
Division 09 - Finishes

Division 09 - Finishes

Finishes, Maintenance of Finishes, Paint Cleaning, Painting and Coating
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings, HVAC Air Cleaning Devices
Division 27 - Communications

Division 27 - Communications

Voice Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Planting, Plants, Ground Covers
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection, Jetties
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
259
Active Projects
162
Bidding Soon
2,253
All Active Projects
1,034
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 3, 2024

November 17, 2024

img_map_placeholder

Cenacle Trail, Warrenville, IL


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Cenacle Trail Bridge Rehabilitation

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.