BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a pre-engineered storage facility in Key Biscayne, Florida. Completed plans call for the construction of a pre-engineered storage facility; and for site work for a pre-engineered storage facility.

*As of August 26, 2024, the bids received are still under evaluation and not yet awarded. There is no projected project start date at this time. Scope of Work - The scope of this Contract is to build a new storage building and warehouse at the Central District Wastewater Treatment Plant (CDWWTP) to replace the existing storage building & warehouse. The new warehouse will be LEED Silver Certified. Location - Central District Wastewater Treatment Plant (CDWWTP) located at 3989 Rickenbacker Causeway, Miami, 33149 Project Duration: 425 Calendar Days to Substantial Completion, 455 Calendar Days to Final Completion, plus a 46 Calendar Day Contingency Period. Estimated Range of the Base Bid - $20,358,601.26 to $24,632,782.74, not including contingency and dedicated allowances. This contract has Small Business Enterprise (SBE) goals as follows: Construction: 10.64%, Goods: 5.05%, Services: No Measure. Goalsare based on theconstruction estimate plusthe 10% Contingency Allowance. The Community Workforce Program (CWP) is not applicable to this project. This contract has Small Business Enterprise (SBE) goals as follows: Construction: 10.64%, Goods: 5.05%, Services: No Measure. Goalsare based on theconstruction estimate plusthe 10% Contingency Allowance. The Community Workforce Program (CWP) is not applicable to this project. The contractor will need to comply with Section 2-11.17 of the MDC Code, inclusive of all amendments, including the apprentice and on-the-job training requirements. Nothing in this solicitation shall in any way be utilized to request documentation relating to or authorizing consideration of a proposer's social, political, or ideological interests when determining if the proposer is a responsible vendor or give a preference to a proposer based on the proposer's social, political, or ideological interests. The Bid Proposal must be accompanied by a bid security in an amount not less than five percent (5%) of the total bid. The successful contractor must execute a one hundred (100%) Surety Performance and Payment Bonds. NO BIDDER MAY WITHDRAW HIS BID WITHIN 120 DAYS FROM BID OPENING DATE. The Board of County Commissioners, Miami-Dade County, Florida, reserves the right to reject any or all bids, to waive any informality in any bid or to re-advertise for bids. Bids from any person, firm or Corporation in default on other contracts or agreements with the County may be rejected. Failure by the Bidder to satisfy claims on previous contracts with the County may be cause for rejection of his bid. The County reserves the right to postpone or cancel the bid opening at any time prior to the scheduled opening of bids.

Bid Results

Warehouse / Distribution - Pre-Engineered Storage Building

$28,095,288.00

Public - County

New Construction, Site Work

183

35

150

6

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
108
Active Projects
38
Bidding Soon
1,053
All Active Projects
457
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 3, 2024

August 26, 2024

img_map_placeholder

3989 Rickenbacker Causeway, Key Biscayne, FL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.