BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 27, 2024 at 8:00 PM

Updated June 28, 2024

Site work and paving for a sidewalk / parking lot in Tewksbury, Massachusetts. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

FY 2024 Sidewalk Improvements - Chandler St. and Pleasant St. The work includes, but is not limited to: replacement of an existing asphalt sidewalk and driveway aprons, installation of new granite curb, new five foot wide asphalt sidewalk, accessible concrete ramps and detectable warning panels, beacons and related line painting along approximately 2850 linear feet of roadway, and also involving related work. Bid Opening at Tewksbury DPW, above agency address at the deadline. Engineer: Coughlin Environmental Services, LLC, Stoneham, MA.

Bid Results

Sidewalks / Parking Lot

$471,578.00

Public - City

Paving, Site Work

18

11

3

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
556
Active Projects
207
Bidding Soon
4,314
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 2, 2024

June 3, 2024

Project location map

Multiple Locations, Tewksbury, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.