EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 26, 2024 at 8:00 PM

Updated October 1, 2024

Site work and paving for a mixed-use development in Willow Springs, Illinois. Completed plans call for site work for a playground / park / athletic field; road / highway; playground / park / athletic field; and water / sewer project.

Playground Improvements at Santa Fe Park Questions will be answered in the form of written addenda and provided to all Bidders, as per State of Illinois statutes. Submit questions regarding the bid in writing to Wight & Co. via gberger@wightco.com no later than 2:00 PM on April 23, 2024. This work is related to the Santa Fe Park Playground Renovation and Landscape Improvements and includes demolition and removal of existing equipment, furnishings, and EWF surfacing, installation of owner furnished Burke playground equipment, district furnished site furnishings, installation of EWF surfacing and drainage, Installation of asphalt sport court, fencing, plantings, and seeding operations and any other miscellaneous work necessary for a complete job as depicted in the plans and specifications. The District encourages the participation of businesses owned by Minorities, Females and Persons with Disabilities in the implementation and execution of the Project, either on a direct basis or through subcontracting efforts. DBE requirements for the Project are consistent with State of Illinois DBE requirements. A DBE Form must be submitted as a part of Contractor's bid. The contractor awarded the contract will be required to post a performance bond, labor and material payment bond in a penal amount equal to the contract price, plus insurance meeting District requirements, and furnish monthly Certified Payroll documentation meeting Illinois Department of Labor requirements. The contractor awarded the contract will be required to licensed by the Village of Willow Springs, Illinois and complete all licensing requirements, fees, and deposits as required by the Village of Willow Springs This contract calls for the construction of a "public work", within the meaning of the Illinois Prevailing Wage Act, 820 ILCS 130/0.01, et seq. (the "Act") The Act requires contractors and subcontractors to pay laborers and workers performing services on public works projects no less than the "prevailing rate of wages" (hourly cash wages plus fringe benefits) in the county where the work is performed. For information regarding current prevailing wage rates, please refer to the Illinois Department of Labor's website at: http://www.state.il.us/agency/idol/ rates. All contractors and subcontractors rendering services under this contract must comply with all requirements of the Act, including but not limited to, all wage, notice and record keeping duties. For the entire duration of this work under the Contract, the Contractor shall conform to the federal and state statutes on equal opportunity and fair employment. Submission of required certified payroll records will be required prior to payment by Owner to the installation contractor. This notice shall not create any legal obligation on behalf of the District to evaluate any bid that is submitted by a contractor, or to enter into any contract with a contractor submitting a bid. The District reserves the right to (1) cancel or modify this notice or the contract documents in whole or in part; (2) reject any or all bids submitted; (3) waive nonmaterial formalities and technicalities deemed appropriate; (4) postpone bid opening; (5) issue a call for new bids; and/or (6) award the contract for the project in whole or in part, or to one or more contractors.

Award

Roads / Highways

$187,200.00

Public - City

Paving, Site Work

13

17

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Quality Requirements, Quality Control, Testing Laboratory Services, Execution and Closeout Requirements, Examination and Preparation, Closeout Submittals, Project Record Documents
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 12 - Furnishings

Division 12 - Furnishings

Multiple Seating, Pews and Benches, Benches
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Fill, Backfill, Compaction, Trenching and Backfilling, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Unit Paving, Planting, Plants, Shrubs, Trees
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
189
Active Projects
106
Bidding Soon
2,254
All Active Projects
1,015
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 30, 2024

July 8, 2024

img_map_placeholder

11811 Willow Ridge Dr, Willow Springs, IL

Related To This Project


Cut Costs, Not Corners.

Get Access Now

Get the right
data with Project Intelligence

Share with your network.

Playground Improvements at Santa Fe Park

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.