BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 24, 2024 at 8:00 PM

Updated August 25, 2024

Site work and paving for a sidewalk / parking lot in Telluride, Colorado. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Reference Number 0000357647 Job Location: Telluride, CO Length: 1,911 Road Name: Colorado Avenue Award Contract: August 21, 2024 Substantial Completion (Phase I): Friday, September 26, 2025 Final Completion (Phase I): Friday, October 3, 2025 Substantial Completion (Phase II): Friday, October 31, 2025 Final Completion (Phase II): Friday, November 14, 2025 Removal and replacement of approximately 5,725 SY of 4-inch concrete, 1,750 LF of curb and gutter, and 320 TONS of hot mix asphalt (HMA). Construction of curb ramps and sidewalk shall be compliant with Americans with Disability Act (ADA) and CDOT standards. Project also involves the removal and replacement of approximately 25 Town supplied lamp posts, and construction of associated 66-inch depth reinforced concrete base. Project involves placement of approximately 2,800 SF of new heat coils and connections to existing heat coils within areas of heated sidewalk. Project involves the following trades: concrete, asphalt, electrical, and plumbing. Project involves seven (7) intersections, with Pine St., Spruce St., Willow St., and Alder St. to be prioritized as Phase I, and Aspen St., Oak St., and Fir St., as Phase II. Question Deadline 08/20/2024 at 9:00 AM MT Questions are submitted online Yes The Town of Telluride reserves the right to reject any or all Proposals, in part or in whole, or to waive any informalities or technicalities in this Request for Proposal if it is deemed to be in the best interest of the Town to do so. Notice to Proceed: Contingent on Submittals and Temporary Traffic Control Inspection - Tentatively September 4, 2024 Substantial Completion (Phase I): Friday, September 26, 2025 Final Completion (Phase I): Friday, October 3, 2025 Final Invoice (Phase I): Friday, October 10, 2025 Substantial Completion (Phase II): Friday, October 31, 2025 Final Completion (Phase II): Friday, November 14, 2025 Final Invoice Deadline: Friday, November 28, 2025

Post-Bid

Sidewalks / Parking Lot

$450,000.00

Public - City

Paving, Site Work

61

13

7

5

Subscribe For Documents

42 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
21
Active Projects
9
Bidding Soon
132
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 23, 2024

September 4, 2024

Project location map

Multiple Locations, Telluride, CO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.