BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Telluride, Colorado. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

Reference Number 0000345736 Job Location: Town of Telluride - multiple sites The Town of Telluride is seeking Bids for the 2024 Street, Alley and Utility improvements to include the following Work Items: Work Item #1: 500 Blk East Columbia Avenue [Maple to Hemlock]. This portion of the WORK involves milling 2 inches of asphalt, and then placing 2.5 inches of new compacted asphalt (SX75 58-28). Areas with pavement failure following the milling operation will be identified and marked by the Engineer for full depth patch. All millings will be hauled to the wide spot on the Spur. Any asphalt removal with mixed materials will be hauled away. (See Work Item #1 500 Block E Columbia schematic.) Work Item #2: 500 Block West Colorado Avenue [Davis to Townsend] This portion of the WORK involves milling 2 inches of asphalt, and then placing 2 inches of new compacted asphalt (SX75 58-28). Areas with pavement failure following the milling operation will be identified and marked by the Engineer for full depth patch. All millings will be hauled to the wide spot on the Spur. Any asphalt removal with mixed materials will be hauled away. (See Work Item #2 500 Block W Colorado schematic.) Work Item #3: East Colorado Avenue [Pine to Alder]. This portion of the WORK involves milling 2 inches of asphalt, and then placing 2.5 inches of new compacted asphalt (SX75 58-28). Areas with pavement failure following the milling operation will be identified and marked by the Engineer for full depth patch. All millings will be hauled to the wide spot on the Spur. Any asphalt removal with mixed materials will be hauled away. This must be scheduled for the fall. (See Work Item #3 E Colorado [Pine to Alder] schematic.) Work Item #4a: 400 Block Pandora East Half - BID ALTERNATE 1. This portion of the WORK involves milling existing road surface materials and hauling them away for disposal, placing and compacting Class 6 road base, as needed, then furnishing and installing 5 inches of asphalt. (See Work Item #4a 400 Block Pandora East Half (Bid Alternate 1) schematic.) Work Item #4b: 600 Block West Colorado Avenue - Widen Travel Way by 4 feet - BID ALTERNATE 2. This portion of the WORK involves widening the south side of West Colorado Avenue by 4 feet by placing and compacting 6 inches of Class 6 road base or equivalent, or more as needed to level the south edge of the asphalted right of way to a 2% slope, then furnishing and installing 7 inches of asphalt. (See Work Item #4b 600 Block W Colorado Avenue, southside (Bid Alternate 2) schematic.) Work Item #5: Town Park Asphalt. This portion of the WORK involves removing 10 feet of asphalt and several inches of base west of the existing 8-inch-thick concrete valley pan and replacing it with 6 inches of asphalt patch. East of the valley pan, scarify and remove 6 inches of native material, place back and compact 6 inches of Class 6 road base or equivalent, and place 4 inches of asphalt (SX75-58-28). (See Work Item #5 Town Park schematic.) Work Item #7: 100 Blk North Willow Street. This portion of the WORK involves milling existing road surface materials and hauling them away for disposal, placing and compacting Class 6 road base, as needed, then furnishing and installing 5 inches of asphalt. This must be scheduled for the fall.(See Work Item #7 100 Blk N Willow schematic.) Award Contract: Friday, March 15, 2024 Notice to Proceed: Monday, April 1, 2024 Substantial Completion: Friday, October 18, 2024 End of Contract: Friday, November 1, 2024 The successful Bidder will be required to furnish a Performance Bond and a Payment Bond guaranteeing faithful performance and the payment of all bills and obligations arising from the performance of the Contract. Bid security in the amount of not less than five percent (5%) of the total Bid must accompany each Bid in the form specified in the Instructions to Bidders (Section 00100). No Bid may be withdrawn within a period of thirty (30) days after the date fixed for opening Bids. The Town of Telluride reserves the right to reject any or all Proposals, in part or in whole, or to waive any informalities or technicalities in this Request for Proposal if it is deemed to be in the best interest of the Town to do so. All questions about the meaning or intent of the Bidding Documents are to be submitted in writing to the OWNER Questions received less than five (5) days prior to the date for opening Bids may not be answered.

Bid Results

Roads / Highways

$1,124,518.00

Public - City

Paving, Site Work

11

10

2

5

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
11
Active Projects
4
Bidding Soon
74
All Active Projects
25
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 15, 2024

April 1, 2024

img_map_placeholder

Multiple Locations, Telluride, CO

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.