BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Telluride, Colorado. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

Reference Number 0000359488 Installation of 770 LF of 10-inch sanitary sewer, four (4) 4-foot diameter manholes, and associated connections to existing sanitary sewer laterals and mains. Project involves construction dewatering with heavy metal removal, and all other associated work items for a complete sanitary sewer re-alignment project. Paving portions of the project involve removal and replacement of approximately 530 tons of 5-inch-thick hot mix asphalt, aggregate base course, subgrade preparation, and associated density and moisture testing. Project connects to existing manhole in Pacific Ave., then involves upsizing existing 8-inch sewer along the east side of Tomboy St., then involves new sewer installation through the Canyonlands Lot, and then finishes with a connection to the existing manhole in W. Colorado Ave. Note that Bid Alternate A and Bid Alternate B have the exact same scope of work; however, different completion dates. Contractor may bid on one or both; however, one project (A or B) will be awarded based on price and schedule. Work shall generally not be permitted on the weekends without Public Works' prior approval. Contractor must coordinate with Public Work and Telluride Lodge HOA with respect to construction schedule, parking access on Tomboy Street, and alternative parking at Carhenge Parking Lot. Prior to contract award contractor must submit a detailed construction schedule, and traffic control plan. Substantial completion is defined as sewer has been installed and accepted (via CCTV), and paving is complete. The Town of Telluride reserves the right to reject any or all Proposals, in part or in whole, or to waive any informalities or technicalities in this Request for Proposal if it is deemed to be in the best interest of the Town to do so. Question Deadline 09/03/2024 at 12:00 PM MT Questions are submitted online Yes Substantial Completion: Friday, November 15, 2024 (Bid Alternate A): Final Completion: Friday, December 20, 2024 (Bid Alternate A): Final Invoice Deadline: Tuesday, December 31, 2024

Post-Bid

Roads / Highways

$200,000.00

Public - City

Paving, Site Work

39

19

4

6

Subscribe For Documents

42 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
11
Active Projects
4
Bidding Soon
74
All Active Projects
25
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 10, 2024

October 10, 2024

img_map_placeholder

Multiple Locations, Telluride, CO


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.