BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a municipal facility in Topeka, Kansas. Completed plans call for the renovation of a municipal facility.

Renovation of Entryway Vestibule. SITE EVALUATION: Failure to adequately inspect the premises shall not relieve the successful vendor from furnishing without additional cost to the County any materials, equipment, supplies or labor that may be required to carry out the intent of the RFP. Submission of a proposal shall be construed as evidence that the vendor has made necessary examination, inspection and investigation. SECTION 01 3000 - Product submittals: Submit product data for each product used. Allow 3 weeks for initial review and 2 weeks for resubmittal. All products to be installed per manufacturers recommendations. All products as specified as basis of design, all products shall be approved by owner. SECTION 01 5000 - Facilities & temporary controls: Provide safety precautions around construction & staging areas. Provide barricades, warning signs & environmental protection to comply with building code requirements, health & safety regulations, police & fire department considerations & environmental protection regulations. Comply with NFPA 241 "standard for safeguarding construction alterations and demolition operations." SECTION 01 7000 - Execution & Closeout Coordinate excessively loud construction activities with owner. Protect existing building & site to prevent damage. Contractor shall be responsible to photo document site prior to construction. Contractor shall be responsible for fixing all damages to building if not proven that it was previously existing by photo Documentation. Examine existing conditions prior to beginning work. Coordinate any issues with architect. Beginning of work constitutes acceptance. Of existing conditions. Make vertical elements plumb and horizontal elements level unless otherwise indicated. Execute final cleaning before substantial completion walk thru. Notify owner when work is ready for substantial and final completion. Shawnee County reserve the right to accept or reject any part of, or all of, any bid or proposal

Bid Results

Municipal

$57,800.00

Public - County

Renovation

3

3

6

3

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
55
Active Projects
30
Bidding Soon
714
All Active Projects
281
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 2, 2024

June 3, 2024

img_map_placeholder

117 SE 7th St, Topeka, KS

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.