BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 29, 2025 at 8:00 PM

Updated May 30, 2025

Site work and paving for a mixed-use development in St Charles, Illinois. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

As of May 29, 2025, engineer has been selected. General contractor identified. Construction ongoing and completion expected by end of 2025. Engineering - Swenson Avenue Base Reclamation Project. A person filing a notice of protest will be required; at the time the notice of protest is filed, to post a bond in the form of a cashier's check in an amount equal to twenty-five percent of the City's estimate of the total value of the award, or $1,000, whichever is less. Question Deadline 04/19/2024 at 8:00 AM CT Questions due prior to 8:00am Procurement@stcharlesil.gov . Answers published at online .April 23, 2024. M/WBE's are encouraged to participate in the bid process. Scope of Work The City of St. Charles is requesting proposals to perform Construction Engineering Services for the Swenson Avenue Base Reclamation Project. The selected Consultant will act as the City's Resident Engineer for the project and as liaison for the City to the impacted property owners. The City reserves the right to reject any and all offers in whole or in part according to the best interests of the City. The method of Contractor Selection has not been Determined at this time.

Under Construction

Roads / Highways

$1,000,000.00

Public - City

Paving, Site Work

14

5

2

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
463
Active Projects
249
Bidding Soon
3,408
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 28, 2024

Project location map

Swenson Ave, St Charles, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.