BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 13, 2024 at 8:00 PM

Updated July 14, 2024

Site work for a bridge / tunnel in Winter Garden, Florida. Completed plans call for site work for a bridge / tunnel.

Counties: Orange Road Name: Paint Bridges on Ramps at SR91/SR 429 Intchng (MP 267) Limits: 75470160 Project(s): 43854815201(*) Federal Aid No: N/A Total Roadway Length: 1.147 Miles Total Bridge Length: 1.134 Miles Total Proposal Length: 2.281 Miles Special Start Date: N/A Aquis/Flexible Start Time: 90 Description: Work consists of providing all labor, materials, equipment and incidentals necessary for the repainting of the structural steel components and recoating of the concrete surfaces of the bridges 750551, 750604, 750605, 750607, and 750608 and adjacent walls located on or over the SR 429 (Florida's Turnpike) from MP 29.541 to MP 29.320 in Orange County. No Pre-Bid Conference. Contractor must be prequalified. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00. A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - Call Order: 001 Bridge Painting - SR 429 Question Deadline 05/07/2024 at 5:00 PM ET Questions posted to this site will be responded to by the Department. For questions posted after this time, an answer cannot be assured. For all questions posted before the deadline, FDOT will provide and post responses on online. Description. Furnish and install pull boxes, splice boxes, junction boxes, and fiber optic splice vaults as shown in the Plans.

Award

Bridges / Tunnels

$4,734,726.00

Public - State/Provincial

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

9

Subscribe For Documents

30 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
360
Active Projects
157
Bidding Soon
2,760
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 14, 2024

May 24, 2024

Project location map

FL-429, Winter Garden, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.