Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 13, 2024 at 8:00 PM
Updated July 14, 2024
Site work for a bridge / tunnel in Winter Garden, Florida. Completed plans call for site work for a bridge / tunnel.
Counties: Orange Road Name: Paint Bridges on Ramps at SR91/SR 429 Intchng (MP 267) Limits: 75470160 Project(s): 43854815201(*) Federal Aid No: N/A Total Roadway Length: 1.147 Miles Total Bridge Length: 1.134 Miles Total Proposal Length: 2.281 Miles Special Start Date: N/A Aquis/Flexible Start Time: 90 Description: Work consists of providing all labor, materials, equipment and incidentals necessary for the repainting of the structural steel components and recoating of the concrete surfaces of the bridges 750551, 750604, 750605, 750607, and 750608 and adjacent walls located on or over the SR 429 (Florida's Turnpike) from MP 29.541 to MP 29.320 in Orange County. No Pre-Bid Conference. Contractor must be prequalified. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00. A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - Call Order: 001 Bridge Painting - SR 429 Question Deadline 05/07/2024 at 5:00 PM ET Questions posted to this site will be responded to by the Department. For questions posted after this time, an answer cannot be assured. For all questions posted before the deadline, FDOT will provide and post responses on online. Description. Furnish and install pull boxes, splice boxes, junction boxes, and fiber optic splice vaults as shown in the Plans.
Award
Bridges / Tunnels
$4,734,726.00
Public - State/Provincial
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
9
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 14, 2024
May 24, 2024
FL-429, Winter Garden, FL
Related To This Project
Winter Garden, FL
Bid Date: May 10 2024
Winter Garden, FL
Bid Date: May 08 2024
Winter Garden, FL
Bid Date: Jun 03 2024
Winter Garden, FL
Bid Date: Jun 03 2024
Winter Garden, FL
--
Winter Garden, FL
Bid Date: Feb 25 2025
Winter Garden, FL
--
Winter Garden, FL
--
Winter Garden, FL
--
Winter Garden, FL
Bid Date: Jan 08 2025
Winter Garden, FL
--
Winter Garden, FL
--
Winter Garden, FL
Bid Date: May 08 2024
Winter Garden, FL
--
Winter Garden, FL
Bid Date: Apr 05 2024
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
