Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a mixed-use development in Washington, District of Columbia. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
Questions: April 24, 2024, by 4:00PM to james.marshall@dc.gov TYPE OF CONTRACT: In accordance with Title 27 DCMR, Section 2402 and Section 2605, the district contemplates award of a fixed unit price contract with a not-to-exceed amount ("NTE Amount" or "Contract Ceiling") equal to the total Contract award amount for the infrastructure and roadway improvements Project. SCOPE: The Contractor shall provide all labor, materials, equipment, hazardous material abatement, supervision and other services for the construction of the 13th Street SE Infrastructure Improvements Project in accordance with Section C, the Project Plans standards & special conditions, DDOT Gold Book (Attachment J.1.2), Project Special Provisions (Attachment J.1.3) and other associated attachments in Section J.1. The Contractor's scope of work shall include, but is not limited to,site and utility demolition within the project limits of disturbance, erosion and sediment control measures, new underground wet and dry utilities and new roadway & Streetscape improvements for approximately 642 LF for the 13th Street Connector to Alabama Ave SE, 240 LF of Sycamore Drive SE, 467 LF of the SEH entry roadway, 637 LF of a new busway within CHMS (including maintenance parking and bus layover areas), and 263 LF of the WMATA Traction Power Substation (TPSS) access driveway and parking. The work also includes signalized intersections at 13th & Sycamore, 13th & Alabama Ave, and at the CHMS busway exit at Alabama Ave SE, as well as the new Entrance Roadway and Owner supplied Security Booth at the new location of the SEH entry control point. The scope of work also includes construction of new bus shelters and related streetscape improvements and street lighting systems within CHMS and along all roadways in the project limits. Also refer to Sections C.4 Background and C.5.3 Statement of Work herein for a further detailed scope of work. Substantial Completion - the satisfaction of the criteria for completion of construction of the Project set forth in Section 108.09 of the DDOT Gold Book, and as defined by the Department, and utility companies have performed substantial completion inspections and provided punch list of items needed for final acceptance Statement of Work The Contractor shall be required to: 1. Provide a construction schedule for the Project and make necessary monthly adjustments to keep the schedule updated. Schedule shall be in P-6 format per DGS requirements. 2. Implement Traffic Controls. Monitor and maintain traffic controls inside the East Campus and within Public Space both inside and outside the East Campus for the entire duration of the Project as shown in the Contract Plans. Maintain vehicular and pedestrian traffic per DDOT Gold Book or as directed by the DGS COTR. Maintain access to residential, institutional, and commercial establishments using appropriate means as outlined in the Maintenance of Traffic (MOT) in the Contract Plans, DDOT standards, and per the DGS COTR. Plan Holders list not maintained.
Bid Results
Roads / Highways
$17,631,029.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 3, 2024
September 2, 2024
13th St NE, Washington, DC
Related To This Project
Washington, DC
Bid Date: May 22 2024
Washington, DC
--
Washington, DC
--
Washington, DC
--
Washington, DC
Bid Date: Jul 12 2024
Washington, DC
Bid Date: May 28 2024
Washington, DC
--
Washington, DC
Bid Date: Jun 04 2024
Washington, DC
Bid Date: May 10 2024
Washington, DC
Bid Date: Apr 22 2024
Washington, DC
Bid Date: Jun 25 2024
Washington, DC
Bid Date: Sep 23 2024
Washington, DC
Bid Date: May 01 2024
Washington, DC
--
Washington, DC
Bid Date: Jun 28 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.