BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Washington, District of Columbia. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Questions: April 24, 2024, by 4:00PM to james.marshall@dc.gov TYPE OF CONTRACT: In accordance with Title 27 DCMR, Section 2402 and Section 2605, the district contemplates award of a fixed unit price contract with a not-to-exceed amount ("NTE Amount" or "Contract Ceiling") equal to the total Contract award amount for the infrastructure and roadway improvements Project. SCOPE: The Contractor shall provide all labor, materials, equipment, hazardous material abatement, supervision and other services for the construction of the 13th Street SE Infrastructure Improvements Project in accordance with Section C, the Project Plans standards & special conditions, DDOT Gold Book (Attachment J.1.2), Project Special Provisions (Attachment J.1.3) and other associated attachments in Section J.1. The Contractor's scope of work shall include, but is not limited to,site and utility demolition within the project limits of disturbance, erosion and sediment control measures, new underground wet and dry utilities and new roadway & Streetscape improvements for approximately 642 LF for the 13th Street Connector to Alabama Ave SE, 240 LF of Sycamore Drive SE, 467 LF of the SEH entry roadway, 637 LF of a new busway within CHMS (including maintenance parking and bus layover areas), and 263 LF of the WMATA Traction Power Substation (TPSS) access driveway and parking. The work also includes signalized intersections at 13th & Sycamore, 13th & Alabama Ave, and at the CHMS busway exit at Alabama Ave SE, as well as the new Entrance Roadway and Owner supplied Security Booth at the new location of the SEH entry control point. The scope of work also includes construction of new bus shelters and related streetscape improvements and street lighting systems within CHMS and along all roadways in the project limits. Also refer to Sections C.4 Background and C.5.3 Statement of Work herein for a further detailed scope of work. Substantial Completion - the satisfaction of the criteria for completion of construction of the Project set forth in Section 108.09 of the DDOT Gold Book, and as defined by the Department, and utility companies have performed substantial completion inspections and provided punch list of items needed for final acceptance Statement of Work The Contractor shall be required to: 1. Provide a construction schedule for the Project and make necessary monthly adjustments to keep the schedule updated. Schedule shall be in P-6 format per DGS requirements. 2. Implement Traffic Controls. Monitor and maintain traffic controls inside the East Campus and within Public Space both inside and outside the East Campus for the entire duration of the Project as shown in the Contract Plans. Maintain vehicular and pedestrian traffic per DDOT Gold Book or as directed by the DGS COTR. Maintain access to residential, institutional, and commercial establishments using appropriate means as outlined in the Maintenance of Traffic (MOT) in the Contract Plans, DDOT standards, and per the DGS COTR. Plan Holders list not maintained.

Bid Results

Roads / Highways

$17,631,029.00

Public - State/Provincial

Paving, Site Work

31

18

19

3

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
165
Active Projects
77
Bidding Soon
1,922
All Active Projects
746
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 3, 2024

September 2, 2024

img_map_placeholder

13th St NE, Washington, DC

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.