BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Markham, Illinois. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; educational facility; and playground / park / athletic field.

As of June 13, 2024, this project has not yet been awarded. A timeline for the award has not yet been established. Proposals must be submitted on the forms provided. All proposals or bids offered must be accompanied by a bid bond in a form acceptable to the school board, cashiers check, or certified check made payable to the Owner in the amount of not less than five percent (5%) of the total amount of the proposal as a guarantee that if the proposal is accepted, a contract shall be entered into and the performance of the contract is properly secured. The successful Bidder of the construction of the improvement will be required to file a performance and payment bond equal to one hundred percent (100%) of the contract, with sureties to be approved by the Architect, which performance bonds shall be conditioned upon proper and faithful performance by the Contractor of the work specified in accordance with the plans and specifications therefore, according to the time and terms and conditions of the contract: and also that the successful Bidder, now the Contractor, shall properly pay all debts incurred by the Contractor in the execution of the work, including those for labor and material furnished for himself and all of his subcontractors. No bid shall be withdrawn after the opening of the proposals without the consent of School District 144 for a period of sixty (60) days after the scheduled time of closing bids. Bid Package 23- Playground and Play Surface Specification Sections included under this bid package: All Division 00, All Division 01. This bid package none-the-less is required to review all other Divisions and sections of the specifications for their potential impact on this bid package. Failure to do so will not relieve the contractor for any obligations and will not be grounds for any economic relief. A. Select Division 11 work, including but not limited to: i. All Playground equipment B. Select Division 31 and 32 work, including but not limited to: i. All Playground surfacing ii. Sitework, concrete work C. Take delivery of playground equipment. Unload trucks as required. D. Provide all labor for a complete Playground Equipment installation. Excavated materials to be hauled offsite. E. Provide all labor and material for a complete playground surface installation. F. Provide all concrete equipment bases. G. Provide compacted stone base. H. Verification of utilities locations. Excavate around and protect any utilities that are exposed as part of this work. Contractor to include cost for private utility locates. I. Furnish and install all site concrete work as shown on the Drawings and as specified. J. Stripping of topsoil, grass, as indicated on drawings AND as required for new construction. All materials removed by this contractor shall be hauled off-site and disposed of by this contractor. K. Excavating for curbs, walks, and stone. L. Furnishing and placement of clean imported stone fill for playground areas. Bid Package 24 Fencing Specification Sections included under this bid package: All Division 00, All Division 01. This bid package none-the-less is required to review all other Divisions and sections of the specifications for their potential impact on this bid package. Failure to do so will not relieve the contractor for any obligations and will not be grounds for any economic relief. The work under this bid package includes but is not limited to: A. All Division 32 work, including but not limited to: a. Provide submittals and shop drawings. b. Provide all labor and material for a complete fence installation. i. Spoils are to be hauled offsite and disposed of by this contractor. ii. Vehicle traffic will not be allowed in grassy areas. c. Cleaning of roads, walkways, and landscape areas of mud, spoils, and concrete during the installation process. d. Repair any areas damaged during the installation process. e. Location of reference points and building lines and provide lay-out as required to complete the work under this bid package. Approximate start of construction shall be: May 13, 2024 for construction activity Substantial completion of all work shall be by July 31, 2024 The Contractor shall be required to furnish sufficient insurance or guaranty of indemnity to School District 144 against any and all claims which might arise for damages to persons or property due to the negligence of the Contractor or Subcontractors, or their officers, agents, employees or servants, during the construction of said improvement and until the said improvement has been finally accepted as complete by the School District 144. The Owner reserves the right to reject any and all proposals or bids Bid Results : BP23 - Playground and Play Surfaces Playground Safe LLC $ 190,000.00 BP24 - Fencing Action Fence Contractors, Inc. $ 16,715.00

Bid Results

Educational

$206,715.00

Public - County

Paving, Site Work

15

11

4

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
183
Active Projects
91
Bidding Soon
1,766
All Active Projects
786
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 1, 2024

May 13, 2024

img_map_placeholder

16239 Lawndale Ave, Markham, IL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.