Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a mixed-use development in Markham, Illinois. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; educational facility; and playground / park / athletic field.
As of June 13, 2024, this project has not yet been awarded. A timeline for the award has not yet been established. Proposals must be submitted on the forms provided. All proposals or bids offered must be accompanied by a bid bond in a form acceptable to the school board, cashiers check, or certified check made payable to the Owner in the amount of not less than five percent (5%) of the total amount of the proposal as a guarantee that if the proposal is accepted, a contract shall be entered into and the performance of the contract is properly secured. The successful Bidder of the construction of the improvement will be required to file a performance and payment bond equal to one hundred percent (100%) of the contract, with sureties to be approved by the Architect, which performance bonds shall be conditioned upon proper and faithful performance by the Contractor of the work specified in accordance with the plans and specifications therefore, according to the time and terms and conditions of the contract: and also that the successful Bidder, now the Contractor, shall properly pay all debts incurred by the Contractor in the execution of the work, including those for labor and material furnished for himself and all of his subcontractors. No bid shall be withdrawn after the opening of the proposals without the consent of School District 144 for a period of sixty (60) days after the scheduled time of closing bids. Bid Package 23- Playground and Play Surface Specification Sections included under this bid package: All Division 00, All Division 01. This bid package none-the-less is required to review all other Divisions and sections of the specifications for their potential impact on this bid package. Failure to do so will not relieve the contractor for any obligations and will not be grounds for any economic relief. A. Select Division 11 work, including but not limited to: i. All Playground equipment B. Select Division 31 and 32 work, including but not limited to: i. All Playground surfacing ii. Sitework, concrete work C. Take delivery of playground equipment. Unload trucks as required. D. Provide all labor for a complete Playground Equipment installation. Excavated materials to be hauled offsite. E. Provide all labor and material for a complete playground surface installation. F. Provide all concrete equipment bases. G. Provide compacted stone base. H. Verification of utilities locations. Excavate around and protect any utilities that are exposed as part of this work. Contractor to include cost for private utility locates. I. Furnish and install all site concrete work as shown on the Drawings and as specified. J. Stripping of topsoil, grass, as indicated on drawings AND as required for new construction. All materials removed by this contractor shall be hauled off-site and disposed of by this contractor. K. Excavating for curbs, walks, and stone. L. Furnishing and placement of clean imported stone fill for playground areas. Bid Package 24 Fencing Specification Sections included under this bid package: All Division 00, All Division 01. This bid package none-the-less is required to review all other Divisions and sections of the specifications for their potential impact on this bid package. Failure to do so will not relieve the contractor for any obligations and will not be grounds for any economic relief. The work under this bid package includes but is not limited to: A. All Division 32 work, including but not limited to: a. Provide submittals and shop drawings. b. Provide all labor and material for a complete fence installation. i. Spoils are to be hauled offsite and disposed of by this contractor. ii. Vehicle traffic will not be allowed in grassy areas. c. Cleaning of roads, walkways, and landscape areas of mud, spoils, and concrete during the installation process. d. Repair any areas damaged during the installation process. e. Location of reference points and building lines and provide lay-out as required to complete the work under this bid package. Approximate start of construction shall be: May 13, 2024 for construction activity Substantial completion of all work shall be by July 31, 2024 The Contractor shall be required to furnish sufficient insurance or guaranty of indemnity to School District 144 against any and all claims which might arise for damages to persons or property due to the negligence of the Contractor or Subcontractors, or their officers, agents, employees or servants, during the construction of said improvement and until the said improvement has been finally accepted as complete by the School District 144. The Owner reserves the right to reject any and all proposals or bids Bid Results : BP23 - Playground and Play Surfaces Playground Safe LLC $ 190,000.00 BP24 - Fencing Action Fence Contractors, Inc. $ 16,715.00
Bid Results
Educational
$206,715.00
Public - County
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 1, 2024
May 13, 2024
16239 Lawndale Ave, Markham, IL
Related To This Project
Markham, IL
Bid Date: Aug 02 2024
Markham, IL
Bid Date: Jan 15 2021
Markham, IL
Bid Date: Dec 03 2024
Markham, IL
Bid Date: Oct 30 2024
Markham, IL
Bid Date: Nov 11 2024
Markham, IL
Bid Date: Apr 23 2024
Markham, IL
Bid Date: Jul 02 2020
Markham, IL
Bid Date: Mar 21 2024
Markham, IL
Bid Date: Mar 14 2024
Markham, IL
Bid Date: Apr 11 2024
Markham, IL
Bid Date: Jan 18 2024
Markham, IL
Bid Date: Nov 17 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.