BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 10, 2024 at 8:00 PM

Updated June 27, 2025

Renovation of a parking garage in Parkton, Maryland. Completed plans call for the renovation of a parking garage.

County: Baltimore Cost of Plans: $0.00 Contract No.: BA1755429SBR Classification: B Funding: State Bid Opening: May 23, 2024 F.A.P. Number: N/A Description: This project, located in Baltimore County. The building will be fully occupied by the Administration while the construction work is occurring. This project is comprised of providing comprehensive restoration of the existing floor slab in Hereford Maintenance Shop Facility. Associated plumbing and electrical work shall be required to complement slab restoration. The Work of Project is defined by the Contract Documents and includes, but is not limited to, the following 1. Project Management: Coordination of all aspects of the construction process including, but not limited to, subcontractor coordination and construction phasing. 2. Removal and disposal of existing concrete floor slab and asphalt paving in Shop bay. 3. Installation of new concrete floor slabs. 4. Installation of all services required for operation of the new mobile lifts and related accessories. 5. Relocation of all in-slab or under-slab utilities noted or found during construction to an overhead position except those necessary for proper operation of the systems including independent testing of electrical installations. 6. Replacement of trench drains & related piping. 7. All other work noted on the drawings or specified herein. 8. This project is a lump sum bid: any reference to the unit costs, other than those indicated in the Proposal Form/Summary of Prices, shall be construed to mean: "time will not be measured, but shall be incidental to the Lump Sum Bid for this Project. The building will be fully occupied by the Administration while the construction work is occurring. Bid Security shall equal at least five percent (5%) of the total amount bid. Also, the successful bidder will be required to supply Payment and Performance Bonds for all Contracts in excess of $100,000.00. The MDOT SHA reserves the right to reject any and all bids. MDOT Call Order 104 - Hereford Shop Garage Bay Floor Restoration Facilities Improvements

Award

Parking Garage

$159,401.00

Public - State/Provincial

Renovation

15

15

8

7

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
156
Active Projects
8
Bidding Soon
2,117
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 6, 2024

July 5, 2024

Project location map

306 Mt Carmel Rd, Parkton, MD

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.