BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Eaton, Colorado. Completed plans call for site work for a water / sewer project; road / highway; and for paving for a road / highway.

**As of August 14, 2024 , This project has been awarded to Mountain Constructors, Inc for $53,545.50** Reference Number 0000355849 Job Location: Eaton, CO This project consists of the construction of a new 8 PVC water main in Cottonwood Avenue from 2nd Street to 5th Street in Eaton, CO. The existing water main will be abandoned, and all existing water services will be reconnected to new water main. This work also includes the installation of water meters and pits, asphalt removal and replacement and other miscellaneous work. Question Deadline 07/02/2024 at 5:00 PM MT Questions are submitted online No, Questions and Clarifications shall be submitted to Brad Curtis, P.E. eaton@epsgroupinc.com Buyer Preferences, Guidelines & Requirements General Requirements - Bid Deposit Required - Insurance Required Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Payment Bond 100 % All bid proposals must be on the form provided and must be accompanied by a certified check or bank draft, payable to the order of the Town of Eaton negotiable U.S. Government bonds (at par value) or a satisfactorily Bid Bond executed by the Bidder and an acceptable surety in an amount equal to five percent (5%) of the total Bid. Checks accompanying bids accepted will be returned to the bidders. The selected Contractor will be required to furnish a 100% Contract Performance Bond and a 100% Contract Payment Bond to cover the execution of the Work which shall be in conformity with the Form of Bonds contained in the Specifications and for the Contract Amount. The Work will be substantially completed by November 1, 2024, and complete and ready for final payment by November 10, 2024. No bids shall be withdrawn after the opening of the bids without the consent of the Town of Eaton, for a period of sixty (60) days after the scheduled time of opening bids. The Town of Eaton reserves the right to reject any or all bids, to waive any informalities in bids, and to accept the bid that, in the opinion of the Town of Eaton, is in the best interests of the Town of Eaton.

Award

Water / Sewer

$501,982.00

Public - City

Paving, Site Work

10

13

5

4

Subscribe For Documents

92 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
83
Active Projects
40
Bidding Soon
925
All Active Projects
388
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 9, 2024

August 8, 2024

img_map_placeholder

S Cottonwood Ave, Eaton, CO

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.