BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 8, 2024 at 8:00 PM

Updated May 9, 2024

Site work and paving for a road / highway in Morton Grove, Illinois. Completed plans call for site work for a road / highway; and for paving for a road / highway.

This project will be financed by Village of Morton Grove funds. The Work included in this Contract shall consist of furnishing all the materials, labor, equipment and incidentals required for hot-mix asphalt removal, concrete removal, brick removal, fence removal, excavation, aggregate base construction, concrete walk construction, concrete curb construction, brick paver construction, fence installation, electrical conduit and conductor installation, lighting unit installation, site furnishings installation, landscape installation, irrigation system installation, and all other incidental work necessary to complete this improvement according to the Contract Documents General questions regarding the Contract Documents should be directed to Mr. Chris R. Tomich, P.E., Village Engineer, Public Works Department, via fax to (847) 965-9511. All Proposals must be accompanied by a proposal guaranty in a minimum amount of 5% of the bid amount as provided in the General Provisions and, where applicable, Proposal Guaranty as a Bid Bond, Certified Check or Cashiers Check. The right to waive any irregularity and to reject any or all bids is reserved to the President and Board of Trustees of the Village of Morton Grove.

Post-Bid

Roads / Highways

$300,000.00

Public - City

Paving, Site Work

19

5

2

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
503
Active Projects
278
Bidding Soon
3,631
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 1, 2024

June 3, 2024

Project location map

Lincoln Ave & Ferris Ave, Morton Grove, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.