BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 20, 2024 at 8:00 PM

Updated June 21, 2024

Site work for a water / sewer project in Davenport, Iowa. Completed plans call for site work for a water / sewer project.

As of June 20,2024, project was awarded to Lawns Unlimited of Iowa Inc., awarded amount is $272,781.86. For all bids over $100,000, the City of Davenport requires a Bid Bond of 5% of the bid amount. A copy of the front page of the bid bond must be attached in the "Response Attachments" tab of the bid package. Bids over $100,000, submitted without a bid bond will not be considered. For awarded bids over $100,000, the awarded contractor will be required to furnish a Performance Bond in an amount equal to one hundred percent (100%) of the Contract amount, and said bond to be issued by a responsible surety approved by the City and shall guarantee the faithful performance of the Contract and the terms and conditions therein contained. Working Days - Division 1: Work under this contract shall commence within 10 days from receipt of written Notice to Proceed from the City. The Contractor shall complete all work under this contract by October 31, 2024. No work shall commence until a Notice to Proceed has been issued. Division 2: Work under this contract shall commence within 10 days from receipt of written Notice to Proceed from the City. The Contractor shall complete all work under this contract by December 1, 2024, with the exception of plant stand annual operation and maintenance. No work shall commence until a Notice to Proceed has been issued. Question Deadline 04/29/2024 at 2:00 PM CT Liquidated Damages - Liquidated damages shall be $500.00 per day for both Division 1 and Division 2. The proposed work includes all labor, materials, tools, supplies, utility and transportation services, equipment and all incidentals necessary This work shall comply with SUDAS Section 11,020 City of Davenport-SUDAD Supplemental Specification, and as specified herein. Lump sum price includes, but is not limited to, movement of personnel, equipment, and supplies to the project site; establishment of offices, buildings, and other necessary for the project; bonding, permits, or other expenses incurred prior to construction. Payment will be made at the contract Lump Sum price for MOBILIZATION, which price will include all labor, materials, and equipment necessary to complete this item. The Contractor shall commence the Work on the date specified in a notice to proceed, in the absence of a notice to proceed within ten days following the date of approval of the contract bond and insurance by the City. The first working day shall be the date specified in the notice to proceed or the date the Contractor actually commences the Work, whichever is earlier. The Contractor shall carry the Work forward expeditiously with adequate workers, equipment, and materials so that it will achieve Final Completion within the Contract Time. Question Deadline 04/29/2024 at 2:00 PM CT

Award

Water / Sewer

$272,782.00

Public - City

Site Work

28

9

6

6

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
146
Active Projects
83
Bidding Soon
1,167
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 8, 2024

June 7, 2024

Project location map

Multiple Locations, Davenport, IA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.