BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 18, 2024 at 8:00 PM

Updated June 19, 2024

Renovation of a municipal facility in Lihue, Hawaii. Completed plans call for the renovation of a municipal facility.

**As of June 18, 2024, project was awarded to Harvey’s Flooring, Inc, awarded amount is $67,408.35.** Finance Department Flooring Project Second Floor Finance Department (1) Lobby (2) Office #1 (3) Accounting (4) Office #2 (5) Office #3 (6) Office #4 (7) Office #5 (8) Meeting Room (9) Hall (10) Conference (11) Records (12) Kitchen (13) Storage First Floor Finance Department: (1) Entrance / Copy Room (2) Office #1 (3) Office #2 (4) Kitchen a. Remove and dispose of existing wall base. b. Remove and dispose of existing vinyl composition tile in the second-floor kitchen, storage room, records room, and first floor kitchen. c. Clean, vacuum, and prepare the subfloors throughout the building to include leveling the floors with cement base filler. d. Install Metroflor Engage Inception 20 MIL (Color: Poipu), waterproof plank flooring, in the second-floor kitchen, storage room, records room, and first floor kitchen as depicted in Attachment A. e. Install Mohawk Visual Connection (Color: 969: Iron) carpet tile flooring in the office spaces as depicted in Attachment A on the second floor. f. On the first floor, install carpet tiles (Westminster KRA 707007 Color: Midnight Blue) as depicted in Attachment A. Carpet tiles and wall base colors shall match the carpet tiles and wall base in the adjacent Real Property Collections office space. Verification of brand, model, and color shall be done prior to install). g. Approximate total square footage for carpet tile flooring on both floors is 2,984. h. Approximate total square footage for the waterproof plank flooring on both floors is 646. i. Supply and install matching transition moldings as needed to complete all doorways and transition areas. j. Install matching shoe base at the bottom of the kitchen cabinets. k. Remove all doors, adjust kick plates, cut bottoms of doors to clear new flooring where necessary and reinstall. l. Supply and install Burke 4” wall base, color Gray on the second floor and color Black on the first floor. m. Clean area and dispose of all rubbish and shipping materials.

Award

Municipal

$67,408.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
10
Active Projects
1
Bidding Soon
76
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 10, 2024

June 10, 2024

Project location map

To Be Determined, Lihue, HI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.