BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 7, 2025 at 7:00 PM

Updated March 8, 2025

Site work and renovation of a civil project in Queen Creek, Arizona. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

The Town of Queen Creek (TOQC) is seeking a qualified CMAR to provide preconstruction and construction services at two facilities within the Town's water service area: 1) The Kenworthy Tank and Booster site (Kenworthy Site) is located on the east side of Kenworthy Road approximately 3/4 of a mile north of Combs Road in Pinal County. The Kenworthy site will be constructed within a 53-acre parcel of land known as the Kenworthy Pit, owned by TOQC and formerly a sand and gravel operation. This project will construct a new approximately 1-million-gallon tank and booster system in the northwest corner of the 53-acre site. 2) Main Plant Tank and Boosters Upgrade (Main Plant Site) is situated at North Schnepf Road and East Joy Drive in Pinal County. This site, an existing 2-tank and booster pumps site is to be upgraded to include a new approximately 1-million-gallon tank and additional booster pumps. Question Deadline 02/20/2025 at 5:00 PM MT Project Summary: The Town of Queen Creek (TOQC) is seeking a qualified CMAR to provide preconstruction and construction services at two facilities within the Town’s water service area: 1) The Kenworthy Tank and Booster site (Kenworthy Site) is located on the east side of Kenworthy Road approximately ¾ of a mile north of Combs Road in Pinal County. The Kenworthy site will be constructed within a 53-acre parcel of land known as the Kenworthy Pit, owned by TOQC and formerly a sand and gravel operation. This project will construct a new approximately 1-million-gallon tank and booster system in the northwest corner of the 53-acre site. 2) Main Plant Tank and Boosters Upgrade (Main Plant Site) is situated at North Schnepf Road and East Joy Drive in Pinal County. This site, an existing 2-tank and booster pumps site is to be upgraded to include a new approximately 1-million-gallon tank and additional booster pumps. The CMAR will develop a plan to optimize all aspects of concurrent/overlapping construction of both sites particularly in respect of cost and schedule and as both sites are funded by American Rescue Plan Act (ARPA) funds, both are required to be fully completed [this includes final acceptance and final payment] including required documentation by October 31, 2026. Any failure to meet the construction completion date will endanger the Town’s $35M ARPA grant.

Post-Bid

Water / Sewer

$1,519,000.00

Public - City

Renovation, Site Work

5

10

2

2

Subscribe For Documents

32 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
101
Active Projects
48
Bidding Soon
1,221
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.