Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 18, 2025 at 8:00 PM
Updated March 19, 2025
Renovation of a municipal facility in Madison, Wisconsin. Completed plans call for the renovation of a 17,000-square-foot municipal facility.
The City of Madison Water Utility ("City") is soliciting Bids from qualified vendors for Roof Replacement at Olin Building Questions Due Date: Friday, August 9, 2024 The intent of this project is to replace the existing 17,000 Sift. (approximate, contractor to verify area) of shingled roof with a metal panel roofing system. A. Furnish and install concealed clip metal panel roofing system, including but not limited to: 1. All work to comply with roofing manufacturer's requirements for the specified warranty. 2. Preparation of roofing substrates, including complete tear off of shingles, edge metal, fascia, etc. Wood nailers for roofing attachment. 3. Damaged or rotting R-20 Ventilated Nailable insulation replacement - As approved by the engineer. 4. Self-adhering underlayment. 5. Metal roof edging and coping. 6. Furnish and install metal roof vents. Color to match metal roof panels. 7. Flashings 8. Remove existing Solar Panel mounting bolts and weather seal penetrations. 9. Other roofing-related items specified or indicated on drawings or otherwise necessary to provide a complete roofing system. 10. Furnish and install Non-Penetrative Snow guard system around entire perimeter of roof. 11. Furnish and install all other work and materials considered to be normal and required by the roof material manufacturer for the roofing system specified. CONTRACT COMPLETION Work may commence in 2024 or 2025. If work begins in 2025, the completion date shall be no later than June 1st 2025. Contractor shall provide a minimum of 30 days' notice prior to starting work. Total time for completion of work is SIXTY SEVEN (67) CALENDAR DAYS from the date of the start work letter.
Award
Municipal
$440,100.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
8
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 16, 2024
September 16, 2024
E Olin Ave, Madison, WI
Related To This Project
Madison, WI
Bid Date: Jan 30 2025
Madison, WI
Bid Date: Feb 13 2025
Madison, WI
--
Madison, WI
Bid Date: May 29 2024
Madison, WI
Bid Date: Apr 25 2024
Madison, WI
Bid Date: May 08 2024
Madison, WI
Bid Date: May 15 2024
Madison, WI
Bid Date: May 23 2024
Madison, WI
Bid Date: May 07 2024
Madison, WI
Bid Date: May 24 2024
Madison, WI
Bid Date: May 09 2024
Madison, WI
Bid Date: Apr 16 2024
Madison, WI
Bid Date: May 07 2024
Madison, WI
Bid Date: May 09 2025
Madison, WI
Bid Date: May 08 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
