BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 30, 2024 at 8:00 PM

Updated July 31, 2024

Site work for a playground / park / athletic field in Almo, Idaho. Completed plans call for site work for a playground / park / athletic field.

ADA parking and picnic area picnic shelter improvements with concrete walkway and fishing pier. A description of the work of this project can be summarized to include site prep, setup and pouring of a 28"X 58" concrete ADA parking and picnic area. Purchasing and installing 16'X 16' open sided metal frame premanufactured picnic shelter. Add alternate bid to build concrete walkway and fishing. A bid bond in the amount of 5 % of the total bid amount ,including any add alternates, s required.

Award

Playgrounds / Parks / Athletic Fields

$128,450.00

Public - State/Provincial

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
14
Active Projects
9
Bidding Soon
107
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 13, 2024

July 15, 2024

Project location map

748 E Castle Rock Rd, Almo, ID

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.