BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Waverly, Tennessee. Completed plans call for site work for a water / sewer project.

** As of June 21, 2024 this project has been to Parchman Construction with an awarded amount of $807,424.71.** 2022 Waverly Sewer System Improvements CDBG - Demo & Remove Existing Pump Station Erosion and sediment control (PS Site & Force Main) Pump Station Installation including duplex pump system in 5 ft dia. concrete wetwell, valve vault, hatches, piping connections, bypass connection, control panel and electrical service. Open Trench 4-inch HDPE DR13.5 Force Main Horizontal Directional Drillling Connect to Existing 4" Force Main Asphalt Pavement Repair Gravel Acccess Road and Fence Air Release Valve Assembly The principal features of the Work to be performed under this Contract includes, but is not limited to: 1. Construction of a wastewater pump station including site piping, valve vault, and new site electrical service and all appurtenances at the Airport Road site. 2. Construction of approximately 2,800 LF of 4-inch HDPE force main and all appurtenances from the Airport Road pump station to a connection point along the existing Airport Road force main. 3. Construction of a wastewater pump station including site piping, valve vault, and new site electrical service and all appurtenances at the West Main Street site. The owner reserves the right to waive any informalities or to reject any or all bids. Each bidder must deposit with his bid, security in the amount, form and subject to the conditions provided in the information for Bidders. All bidders must be licensed General Contractors as required by the Contractors Licensing Act of 1994 of the General Assembly of the State of Tennessee, and qualified for the type of construction being bid upon. Attention of bidders is particularly called to the requirements as to conditions of employment to be observed and minimum wage rates to be paid under the contract, Section 3, Segregated Facitlity, Section 109 and E.O. 11246. No bidder may withdraw his bid within 60 days after the actual date of the opening thereof. Questions to - Jason English jason.english@inflodesign.com every request in writing. 210 Substantial Completion of All Work 240 Final Completion of All Work

Award

Water / Sewer

$807,424.00

Public - City

Site Work

21

15

4

4

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
49
Active Projects
29
Bidding Soon
724
All Active Projects
308
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 9, 2024

June 10, 2024

img_map_placeholder

Multiple Locations, Waverly, TN


Stop wasting time. Get and stay ahead of your competition.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.