BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Redmond, Washington. Completed plans call for site work for a road / highway; and for paving for a road / highway.

**As of May 21, 2024, this project has not yet been awarded, still in the evaluation stages. A timeline for the award has not yet been established.** 2024 Pavement Preventative Maintenance-Slurry Seal The City of Redmond, WA is soliciting bids from qualified contractors to conduct slurry seal in the Rose Hill area of Redmond on NE 70th St and 134th Ave NE including vicinity streets as shown on the project documents. All work shall be in accordance with these Bid Documents, the City of Redmond 2020 Standard Details and Specifications, and the 2024 WSDOT Standard Specifications for Road, Bridge, and Municipal Construction. Contractors are to provide all personnel, mobile equipment, supplies and transportation, essential labor, and materials necessary to the completion of the work. Contractor is responsible for obtaining all licenses and permits to accomplish the work. Contractor to submit traffic control plan within fifteen (15) business days before commencing work on site. Work will not commence till City approves traffic control plans. Bid pricing must include all costs to provide traffic control. All project work areas are to be left in clean condition prior to final inspection and acceptance. Removal and disposal of any scrap material is to be done in compliance with all local and federal laws and requirements. This work is subject to the prevailing wage requirements of the State of Washington. Engineer's Estimate Based on the above outlined Scope of Work, the City estimates that total costs for this project including prevailing wage, taxes, and fees, as falling between $265,000 and $290,000 Project Schedule: Work is to start no earlier than June 25, 2024, but no later than August 12, 2024. All work shall be completed no later than August 26th, 2024, before school is back in session.

Bid Results

Roads / Highways

$290,000.00

Public - City

Paving, Site Work

7

3

3

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
105
Active Projects
34
Bidding Soon
931
All Active Projects
393
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 8, 2024

June 25, 2024

img_map_placeholder

Multiple Locations, Redmond, WA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.