Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a transportation facility in Lumberton Twp, New Jersey. Completed plans call for site work for a transportation facility; and for paving for a transportation facility.
Construct Taxiway Phase 2 at South Jersey Regional Airport; Lumberton Township, Burlington County, New Jersey; Federal Project No: FAA Funded, PE No: N/A, CE No: 5717319 Approximate Construction Start: Summer 2025 Contractors Prequalified in one of these Work Types are eligible to bid this project: 2, 2b, 3, 3a or 5 The Construct Taxiway (Phase II) Project includes removal of Existing Taxiway D between Runway 8-26 & the East Apron, & removal of the Existing Taxi Lane between Existing Taxiway D & the North Side of Industrial Shop #1 (FBO / Aircraft Storage). A new, full-depth asphalt pavement section - relocated / reconstructed Taxiway D - will be constructed between the easternmost portion of Taxiway A (relocated / reconstructed in Phase I) & Runway 8-26. A new, full-depth asphalt pavement section will also be constructed between the East Apron & the North Side of Industrial Shop #1 (FBO / Aircraft Storage); to replace access to / from the North Side of Industrial Shop #1 (FBO / Aircraft Storage). Additionally, three (3) paved aircraft parking stubs (new, full-depth asphalt pavement section) will be constructed off of the Northern edge of the East Apron; to replace three (3) paved aircraft parking stubs removed between Existing Taxiway D & the North Side of Industrial Shop #1 (FBO / Aircraft Storage). Turf areas will be excavated & re-graded to meet site stormwater requirements, & drainage infrastructure will be constructed / modified. Other ancillary items of work include construction of underdrains associated with relocated / reconstructed Taxiway D, demolition / modification / construction of electrical infrastructure, & pavement marking. Pursuant to N.J.S.A. 34:11-56.35(d), if the Commissioner of the Department of Labor and Workforce Development (LWD Commissioner) makes an initial determination that an employer has violated the provisions of P.L.1963, c.150 (C.34:11-56.25 et seq.) by paying wages at rates less than the rates applicable under that act, the LWD Commissioner may immediately issue a stop-work order to cease all business operations at every site where the violation has occurred, and may assess a civil penalty of $5,000 per day against the employer for each day it conducts business operations in violation of the stop-work order. If the stop-work order is issued against a subcontractor, the general contractor may terminate that subcontractor from the project in accordance with N.J.S.A. 34:11-56.35(d). Minimum Wage Rates for This Project Shall Be as Specified in the "Prevailing Wage Determination of the New Jersey Department of Labor and Workforce Development" on File With This Department. The Attention of Bidders is Directed to the Provisions Covering Subletting or Assigning the Contract to Section 108-prosecution and Completion of the New Jersey Department of Transportation Standard Specifications. The Entire Work is to Be Completed on or Before the Estimated Completion Date Stated Above. DOT reserves its right to reject any or all bids in accordance with N.J.S.A. 27:7-30 and N.J.S.A. 27:7-33. NJDOT: 463 - Construct Taxiway Phase 2 at South Jersey Regional Airport The approximate construction time for this project is 2025 summer. This is a Federal Aviation Administration (FAA) funded project. Project is contingent on FAA funding. 3-34-0054-017-2019 (D) FAA AIP PROJECT NO. 3-34-0054- -2024 (C)
Award
Transportation Terminals
$1,238,000.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Find better projects. Build better bids. Win.
Elevate your business with the top source for commercial construction data. Get instant access to five free projects and companies, then subscribe for complete access to all contacts and documents. Unlock new opportunities and start winning more business today!
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
May 14, 2024
July 15, 2024
68 Stacy Haines Rd, Lumberton Twp, NJ
Related To This Project
Lumberton Twp, NJ
--
Lumberton Twp, NJ
--
Lumberton Twp, NJ
--
Lumberton Twp, NJ
Bid Date: Mar 20 2024
Lumberton Twp, NJ
Bid Date: Apr 24 2019
Lumberton Twp, NJ
Bid Date: Jan 10 2024
Lumberton Twp, NJ
Bid Date: Oct 25 2023
Lumberton Twp, NJ
--
Lumberton Twp, NJ
Bid Date: Jan 25 2022
Lumberton Twp, NJ
Bid Date: Mar 10 2022
Lumberton Twp, NJ
Bid Date: Jan 27 2022
Lumberton Twp, NJ
Bid Date: Mar 02 2023
Lumberton Twp, NJ
Bid Date: Jan 18 2023
Lumberton Twp, NJ
Bid Date: Sep 12 2022
Lumberton Twp, NJ
Bid Date: Mar 03 2021
Recently Viewed
--
--
--
--
--
--
--
--
--
--