BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, paving and new construction of a civil project in Pecos, New Mexico. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; and road / highway.

Termini: Nm 63, Mp 22.070 to Mp 22.211 for 0.141 Miles County: San Miguel (District 4) Type of Work: Bridge Replacement, Roadway Reconstruction Mandatory Start Date: June 2, 2025 Contract Time: 90 Working Days Dbe Goal: at This Time Nmdot Will Meet the State Dbe on Federally Assisted Projects Through a Combination of Raceneutral and Race-conscious Measures. This Project is Subject to Race-conscious Measures. The Established Dbe Goal for This Project is 0.00%. Licenses: (Gf-2 or Gf-98) and (Ga-1 or Ga-98) Funding Type: Federal-aid Listing Threshold: None Wage Rate (Federal): Nm20240037 Wage Rate (State): Type "a" (2024) As a condition to submitting a Bid all Bidders bidding as Contractors are required to be prequalified with the NMDOT's Office of Inspector General seven (7) Days before Bid Opening per 18.27.5 NMAC. All Subcontractors are required to be prequalified before performing any Work and prior to supplying goods or services to the Project. The Bidders prequalification factor rolling average will be applied to any Project with an engineers estimate greater than $5 million. All Bidders submitting Bids valued over sixty thousand dollars ($60,000.00) shall be registered with the Department of Workforce Solutions (DWS), Labor Relations before Bidding. The Bidders registration number shall be included on the Bid Form. If a Bidder appears on the DWS list of willful violators of the Public Works Minimum Wage Act (NMSA 13-4-14), the NMDOT shall reject the Bid and shall continue to reject Bids from that Bidder for three years after the date of publication of the list. The Bidders Bid Guaranty shall be five percent (5%) of the Bidders Total Bid Amount and shall be submitted before Bid Opening through either Surety 2000 or Tinubu Surety. Failure of the Bidder to comply with this Advertisement shall render the Bid non-responsive and the Bid shall be rejected. NMDOT - 004 - Bridge Replacement, Roadway Reconstruction - NM 63

Award

Bridges / Tunnels

$6,207,296.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

84

14

24

4

Subscribe For Documents

45 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
11
Active Projects
5
Bidding Soon
157
All Active Projects
62
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 18, 2024

December 17, 2024

img_map_placeholder

NM-63, Pecos, NM


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.