EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 5, 2024 at 8:00 PM

Updated October 1, 2024

Site work for a water / sewer project in Rochester, Pennsylvania. Completed plans call for site work for a water / sewer project.

Each proposal must be accompanied by a certified check, bank check, money order or bidder surety bond in the amount specified in instructions to bidders as a guarantee that if the proposal is accepted, a contract will be entered into, and its performance properly secured The minimum wage rates for each craft or classification of all workmen needed to perform this contract during the anticipated term hereof shall be governed by State Prevailing Wage Rates. PA Steel Product Procurement Act and Competitive Procurement ('Or Equal' Requirements) are mandated for the project. The Sewer Authority reserves the right to waive any informalities or to reject any or all bids, and to award the contract to the best interest of the Authority. All addenda will be issued to the email addresses below. Delivery confirmation to the email address provided will constitute a receipt of the addenda by the contractor. It is the contractor's responsibility to check their email addresses at appropriate intervals. Any questions regarding the project must be sent via email to beaverfalls@widmerengineering.com. All questions and answers will be posted to the bid advertisement page. Questions will not be answered via phone calls during bid stage. Upon completion of each field, double check your information then click "SUBMIT" and you will be directed to the download page. Incorrect or incomplete information could disqualify your bid. Download the bid package in PDF format. All work must be completed in sixty (60) calendar days from Notice to Proceed (NTP). Anticipated NTP will be soon after PennVEST closing on July 18, 2024 All questions concerning this solicitation must be sent via email to no tsadaka@widmerengineering.com later than (5) five days prior to the due date

Award

Water / Sewer

$230,880.00

Public - City

Site Work

9

10

2

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Special Procedures, Alteration Project Procedures, Quality Requirements, References, Reference Standards, Temporary Facilities and Controls, Temporary Utilities, Temporary Lighting, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures, Temporary Barricades, Execution and Closeout Requirements, Examination and Preparation, Execution, Closeout Submittals, Bonds, Warranties
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Equipment, Domestic Water Filtration Equipment
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution, Lighting
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Excavation, Dewatering, Backfill, Compaction, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Planting
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
137
Active Projects
61
Bidding Soon
1,290
All Active Projects
538
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 15, 2024

July 18, 2024

img_map_placeholder

Multiple Locations, Rochester, PA

Related To This Project


Cut Costs, Not Corners.

Get Access Now

Get the right
data with Project Intelligence

Share with your network.

Force Main Replacement - PennVEST

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.