BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and paving for a sidewalk / parking lot in Durango, Colorado. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Reference Number 0000350433 The City of Durango invites interested, qualified persons or firms, capable of providing the required service to submit bids for two temporary expanded sidewalks on Main Avenue, Installation Assistance, and Traffic Control as part of the City of Durango's Downtown's Next Step Design pilot project. The City of Durango is currently designing pedestrian and accessibility improvements along Main Avenue between College Drive and 8th Street as part of the overall Downtown's Next Step Project, which includes a conceptual design for the entire corridor between 5th Street and 14th Street. The City of Durango will be demonstrating some of the design elements during 2024 as a pilot project. The temporary sidewalk expansions will be up to 100-feet at two locations to be determined along Main Avenue between College Drive and 14th Street. The temporary sidewalk needs to be flush even with the curb to provide as natural of a transition as possible, allowing for an ADA compliant experience. The temporary sidewalk should taper diagonally at both ends to provide a natural transition. The temporary sidewalk should use muted, natural colors that match the existing pedlet on Main Avenue, as to distract from the historic nature of Main Avenue and bring continuity to downtown. The budget for this project is $160,000. Question Deadline 05/09/2024 at 3:00 PM MT Questions are submitted online Yes, Each bidder, before submitting his bid, shall become fully informed as to the extent and character of work required. All questions must be submitted via online Notice of Award (estimated) Week of May 14, 2024 Notice to Proceed (estimated) Week of May 20, 2024 Completion Date July 1, 2024 Buyer Preferences, Guidelines & Requirements Participation Requirements - Business Concern - Disadvantaged Business Enterprise (DBE) - Minority Business Participation - Native American Participation - Small Business Participation - Service-Disabled Veteran Owned - Women-Owned Business Participation General Requirements - Installation Required - Insurance Required Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Labor and Materials Bond 100 % The Contracting Agency reserves the right to reject any or all Bids and to waive informalities when such action is deemed to be in the best interest of the Contracting Agency. A conditional or qualified Bid may be cause for rejection. a) The installation shall occur before 9 AM or after 5 PM. b) The installation shall be completed no later than July 1, 2024. c) The selected contractor shall work with City staff to ensure the temporary sidewalk expansion allows for adequate drainage and does not interfere with normal City operations. d) The two temporary sidewalk expansions will be installed on Main Avenue and not exceed 100- feet in linear length at each location. e) The width of the temporary sidewalk cannot exceed 8-feet from the curb-edge of the sidewalk and must be at least 6-feet in width. f) The materials used must be slip resistant and use muted colors to not distract from the historic nature of Durango's Main Ave. g) The temporary sidewalk must be completely flush and even with the curb to allow for ADA compliance. h) Traffic Control a. The selected contractor, and/or their subs shall be responsible for setup and oversight of the traffic control. i) Bids shall include a tentative timeframe and schedule for work, as well as a firm fixed price for the scope of work meeting the specification above. j) All work must be coordinated, in advance, with City staff to allow adequate public notice of the impact to businesses on Main Ave. k) Poured concrete is not permitted. l) All materials must be able to be assembled and disassembled for seasonal use.

Bid Results

Sidewalks / Parking Lot

$135,650.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
7
Active Projects
4
Bidding Soon
62
All Active Projects
23
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 14, 2024

May 20, 2024

img_map_placeholder

Main Ave, Durango, CO

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.