BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 29, 2024 at 8:00 PM

Updated May 30, 2024

Site work and paving for a sidewalk / parking lot in Durango, Colorado. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

As of May 29, 2024, this project has not yet been awarded. A timeline for award has not yet been established. SCOPE OF WORK. Generally, the work under this contract includes furnishing all labor, materials, equipment, tools & supplies, transportation, safety equipment and other items necessary for asphalt and subgrade removal, new base course and asphalt, cleaning and sealing of cracks, seal coat and pavement markings in the parking lot for the Smith Sports Complex at 700 Talon Lane; project map attached. City staff will walk the project with the Contractor prior to work to determine and mark limits of what shall be repaired by Contractor. Payment will be based on actual quantities as agreed and installed. All work shall be completed in accordance with City of Durango Standard Specifications for Construction of Streets and Roads, including weather and temperature requirements, unless otherwise stated in these bid documents. The contractor is responsible for providing Quality Control testing for the project. Mobilization, Traffic Control and Stormwater Management are incidental to the work. See General Conditions for requirements, including review durations. All work shall be completed under the supervision and inspection of the City Project Manager or assigned agent. Any deviation from the project contract documents shall be approved, in writing, in advance. Any deviation from the project contract documents without prior authorization shall result in the immediate suspension of work, and possible termination of contract. Parking Lot Asphalt Repair and Seal Smith Sports Complex The City of Durango invites interested, qualified persons or firms, capable of providing the required services to submit bids for improvements that generally consist of asphalt and subgrade removal, new base course and asphalt, cleaning and sealing of cracks, seal coat and pavement markings in a parking lot. The City of Durango reserves the right to reject any and all bids, to waive any informalities and minor irregularities in bids, and to accept the bid deemed, in the opinion of the City, to be in the best interest of the City of Durango. Questions: Each bidder, before submitting their bid, shall become fully informed as to the extent and character of work required. All questions must be submitted via Rocky Mountain E-Purchasing System website (www.bidnetdirect.com/colorado). Question Deadline: May 14, 2024, Time: 3:00 p.m. (Local Time) (Questions received after the deadline may not be accepted.)

Post-Bid

Sidewalks / Parking Lot

$400,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
34
Active Projects
19
Bidding Soon
160
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 23, 2024

June 7, 2024

Project location map

700 Talon Ln, Durango, CO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.