Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Demolition, site work, paving and renovation of a mixed-use development in Killeen, Texas. Completed plans call for the demolition of a educational facility; for the renovation of a educational facility; for site work for a educational facility; for paving for a educational facility; sidewalk / parking lot; sidewalk / parking lot; sidewalk / parking lot; and sidewalk / parking lot.
Work Included: 1. The "Project" of which the "Work" of this Contract is a part, is titled Killeen High School Building 7 Renovations for Killeen ISD and is composed of interior building renovations and related site work located in Killeen, Texas. 2. The "Work" of this Contract is titled Killeen High School Building 7 Renovations and is defined in the Contract Documents to include, but not necessarily to be limited to: a. Interior building renovations and site work, including all mechanical, electrical, plumbing, and general construction work. 3. Related Work: a. Documents affecting work of this Section include, but are not necessarily limited to, General Conditions, Supplementary Conditions, and Sections in Division 01 of these Specifications. b. The work of other contracts is described in various contract documents prepared therefore, some of which are in the possession of the Owner and are available for inspection by interested parties. Other Work: 1. Owner (if required by Municipality, State or Federal requirements) shall provide evidence to the municipality permitting the project that an asbestos survey has been completed by a person licensed under the Texas Asbestos Health Protection Act to perform such a survey. 2. The architect has no responsibility for the discovery, presence, handling, removal or disposal of or exposure of persons to hazardous materials or toxic substances in any form at the project site. 3. The architect is not required to execute certifications that would require knowledge, services or responsibilities beyond the scope of the architectural service agreement. 4. The architect assists the owner in the owner's responsibility to obtain applicable permits for demolition and construction. 5. Contractor to review and familiarize themselves with owner's Asbestos survey and plan and shall inform every worker that they use on this project as to the availability of these surveys and plans prior to starting any work. PRECONSTRUCTION MEETINGS A. A Kick-Off Pre-Construction meeting will be scheduled to be held upon notification by the Architect. 1. Provide attendance by authorized representatives of the Contractor and major subcontractors. 2. The Architect will advise other parties, including the Owner, and request their attendance. 3. The Architect shall arrange, preside, and record the minutes of the pre-construction meeting. 4. A pre-construction meeting agenda will be issued by the Architect at the meeting. 5. Agenda items to be discussed include: a. Self introductions b. Design concept, scope, and objectives c. Communications d. Contractor's responsibilities e. Documentation and notification f. Progress Meetings g. Submittals/Substitutions h. Project Administration i. Project Closeout j. Warranty Phase B. Quality Control Pre-Construction Meeting 1. Within one week after the "Foundation Pre-Construction Meeting", the Contractor shall schedule and host a "Quality Control Pre-Construction Meeting" following the Agenda in Section 01 4533. C. Framing Pre-Construction Meeting: The Contractor shall not be permitted to install any portion of the superstructure above the foundation until the Contractor has scheduled and held a "General Framing Preconstruction Meeting" in which the following people attend: A representative of the Architect, a representative of the Structural Engineer, the Special Inspection and Testing Agency (SITA), the Superintendent of construction, the Contractor's Project Manager, and all foremen for subcontractors with work related to the framing. Question Deadline 05/09/2024 at 2:00 PM CT
Post-Bid
Educational
$20,445,000.00
Public - City
Demolition, Paving, Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 16, 2024
July 15, 2024
500 N 38th St, Killeen, TX
Related To This Project
Killeen, TX
Bid Date: Jun 05 2024
Killeen, TX
Bid Date: May 16 2024
Killeen, TX
--
Killeen, TX
--
Killeen, TX
--
Killeen, TX
--
Killeen, TX
Bid Date: Jul 03 2024
Killeen, TX
--
Killeen, TX
--
Killeen, TX
Bid Date: Jun 06 2024
Killeen, TX
Bid Date: May 23 2024
Killeen, TX
Bid Date: May 02 2024
Killeen, TX
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.