BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 4, 2025 at 7:00 PM

Updated February 5, 2025

Site work and new construction of an educational facility in Bellville, Texas. Completed plans call for the construction of a 135,520-square-foot educational facility.

As of February 4, 2025, construction has commenced per publicly available information. The scope of work for the BELLVILLE ISD - JR. HIGH SITE & PEMB will be for the following trades and will include but not limited to: Pre-Engineered Metal Building, Building Erection, Pre Engineered Metal Building Insulation, Anchor Bolts, Locating, Surveying and Layout, Equipment, Dumpsters, Common Labor, Site Maintenance, Temporary Fencing, Storage & Security, Demolition, Earthwork, Fine Grading, Spoils Removal, Traffic Control, Termite Control, Dewatering, Storm Sewer, Site & Building Underground Utilities, Structural and Site Concrete, Concrete Reinforcing Steel, Below Grade Plumbing Rough-In, Below Slab Electrical Rough-In, Below Slab Vapor Barrier, Site Pressure Washing & Cleaning, Pavement Markings and Signage, Erosion Control, Hydroseeding, Seeding and Sodding and Other Trades. A. Bid Security: Bid security is not required for this project. B. Guaranty Bonds: Costs for Guaranty Bonds shall not be included in any sub-contractor or material supplier's proposal; however, (construction manager), and/or the (owner) reserve the right to require Guaranty Bonds from any or all. Construction is expected to start June 2024. Completion is expected December 2025.

Under Construction

Educational

$40,000,000.00

Public - City

New Construction, Site Work

53

14

129

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
395
Active Projects
227
Bidding Soon
3,246
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 4, 2024

June 17, 2024

Project location map

518 S Matthews St, Bellville, TX


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.