Site work for a water / sewer project in Garland, Texas. Completed plans call for site work for a water / sewer project.

RFB Request for Bid A sealed written request made to prospective suppliers requesting submission of a bid for goods or services. Advertised. Sealed bids have a state mandated dollar level. NO FAXED OR EMAILED BIDS! All documents (forms) herein and attached are required to be completed and returned with response. All questions must be answered within the Ion Wave Question & Answer segment. No emailed, faxed or phone call question related to this bid will be responded to. The deadline for submitting questions on this bid is May 13, 2024 at 5:00 p.m. This is an evaluated bid, please pay close attention to the GP&L Construction Contractors Questionnaire and provide all of the information requested in a complete and organized response. A Bid Bond in the amount of 5% is required with your bid response. A Performance, Payment and Maintenance Bond will be required upon notification of award. Engineers Estimate: $1,850,000.00 GENERAL DESCRIPTION AND SCOPE OF THE WORK - Ben Davis 345kV/138kV SUBSTATION Garland Power & Light (GP&L), here-in defined as the Owner, is initiating a project to: - Install 1250' of cable trench & conduit to all equipment - Install one (1) 250' run of 2" conduit outside the station for a security light - Install junction boxes on sixteen (16) 138kV Circuit Breakers - Raise twenty (20) existing junction boxes located on PTs, CCVTs & CTs throughout the yard - Installation of thirty-three (33) dual Guard Lights conduit - Pull all exterior control cable & power cable - Reconnect any cut grounding grid runs and stingers as necessary after cable trench install - Demo one (1) pier foundation to 3' below grade This is not an exhaustive list of work to be performed under these specifications. All work as indicated and as noted within the contract drawings listed in Section 1B for this project shall be included.See section 1A.2.1 of this document for the division of responsibilities of the work to be performed at this site. The Owner has decided to self-perform a large portion of the scope of the work; therefore, the Contractor should carefully consider the division of responsibilities as indicated herein.

Bid Results

Water / Sewer

$1,892,429.00

Public - City

Site Work

71

12

4

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
149
Active Projects
67
Bidding Soon
3,565
All Active Projects
1,412
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.