BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Demolition, site work, remodeling and renovation of a bridge / tunnel in San Bernardino, California. Completed plans call for the remodel of a bridge / tunnel.

**As of June 5, 2024 project was awarded to Jilk Heavy Construction Inc., awarded amount is $2,747,417.5000.** Scope of work includes but is not limited to the following: Aggregate, Bearings, CIDH, Clearing & Grubbing, Concrete Barrier, Construction Area Signs, Demolition, Fencing, Grading, Hydroseed, Joint Seal, Masonry, Minor Concrete, Misc. Metals, Paving – HMA, Piping, Cold Plane Asphalt Concrete, Polyester Concrete Overlay, Precast Girders, Prestressing, Ready Mix, Rebar, Roadside Signs, Roadway Excavation, Striping & Marking, Structural Concrete Quality Control, SWPPP, Temp. & Perm. Erosion Control, Traffic Control, Trucking, Under Ground Utility, etc. Engineers Estimate: $2,000,000 DBE Goal: 22% Although a firm timeline has not been confirmed, construction is not expected to start prior to Summer 2024. *The bid list for this project may be incomplete. If you have been invited to bid on this project by the owner, please notify our editorial staff at contentcase@constructconnect.com. Description of Work: Phase 1: The work to be done consists, in general, of fabrication and placement of construction information signs, clearing and grubbing; Removal of an existing bridge over Del Rosa Channel and construction of an overcrossing bridge replacement, construction of various concrete improvements, including sidewalk, driveway approach, curb and gutter; removal and replacement of asphalt concrete pavement including construction of a dike; removal and replacement of existing sanitary sewer maintenance hole and line; removal and replacement of existing domestic water line; removal and replacement of chain link gate and fence; construction of a reinforced concrete retaining wall; installation of speed warning signs; coordination of existing SCE and SCG utilities; NPDES water pollution control requirements; traffic control; survey marking and such other items or details, not mentioned above, that are required by the Plans, Greenbook, or these Special Provisions. Phase 2 The work to be done consists, in general, of fabrication and placement of construction information signs, clearing and grubbing; removal and construction of various concrete and asphalt improvements, including sidewalk, removal and replacement of chain link gate and fence and single and double gates; block wall construction, slurry and striping ,field hydroseed, two optional street paving alternatives, NPDES water pollution control requirements; traffic control and any other items or details, not mentioned above, that are required by the Plans, Greenbook, or these Special Provisions. Project Location Cross Street Bridge over Del Rosa Channel and Fairfax Elementary School @ 1362 Pacific St, San Bernardino, CA 92404 TIME OF COMPLETION The Contractor shall begin work within ten (10) working days after the date of the "Notice to Proceed," and shall diligently prosecute the same to completion by One Hundred and thirtyfive (135) Calendar Days for Phase 1 for construction of the bridge and 20 calendar days for Phase 2 school ground restoration

Award

Bridges / Tunnels

$2,747,417.00

Public - City

Demolition, Remodeling, Renovation, Site Work

125

22

3

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
195
Active Projects
98
Bidding Soon
2,175
All Active Projects
978
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 14, 2024

July 15, 2024

img_map_placeholder

1362 Pacific St, San Bernardino, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.