Site work and paving for a mixed-use development in Reading, Pennsylvania. Working plans call for site work for a 171,540-square-foot sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

As of July 1, 2024, bids were cancelled. Questions Due Date: May 21st 2024, 2:00 PM EDT Online Portal The national goal for participation of Disadvantaged Business Enterprises (DBE) is 10%. SCTA's overall goal for DBE participation is 3.4%. The project includes the rehabilitation of the Berks Transit Center and the 11th Street Parking Lot, Reading, PA All bids and contracts are subject to all applicable state and federal laws and to a financial assistance contract between the South Central Transit Authority and the Pennsylvania Department of Transportation and the Federal Transit Administration. Contractors and subcontractors will be required to comply with all applicable Buy America, Build America Buy America, Non-Discrimination, Non-Collusion, Lobbying, Debarment and Contractor Integrity laws and regulations. All bidders will be required to certify they are not on the Comptroller General's list of ineligible contractors. SCTA solicits and encourages disadvantaged business enterprise participation. DBEs shall be afforded full consideration of their response and will not be subject to discrimination. A DBE goal has been set for each contract of this project. Bidders are advised that this project is subject to and will be governed by the provisions of the federal Davis-Bacon Act, including amendments and supplements thereto. Bidders shall prepare their bids after giving consideration to the applicability of said federal Davis-Bacon Act to the work. A cashier's check, or an acceptable Bidder's Bond, payable to South Central Transit Authority, 45 Erick Road, Lancaster, PA in an amount of not less than 5 percent (5%) of the largest possible total for the bid submitted, must accompany the bid. A Performance Bond and Payment Bond, each for 100 percent (100%) of the contract price will be required. SCTA reserves the right to postpone, to accept or reject any and all bids, in whole or in part, or to waive any and all informalities or technicalities, as it deems in its best interest. No bids may be withdrawn for a period of sixty (60) days after the date set for the opening of bids. All work to be done under this Contract will be performed at the project sites located at 701 North Franklin Street and 1700 N. 11th Street in the City of Reading, Berks County, Pennsylvania.

Final Planning

Sidewalks / Parking Lot

$7,486,447.00

Public - State/Provincial

Paving, Site Work

109

32

21

3

Subscribe For Documents

93 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Assurance, Manufacturer Qualifications, Installer Qualifications, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Progress Cleaning, Final Cleaning, Closeout Procedures, Closeout Submittals, Maintenance Data, Bonds, Warranties, Project Record Documents, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Masonry, Common Work Results for Masonry, Unit Masonry, Concrete Unit Masonry, Glass Unit Masonry
Division 05 - Metals

Division 05 - Metals

Metals, Common Work Results for Metals, Structural Metal Framing, Structural Steel Framing, Metal Fabrications, Metal Railings
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing, Underlayment, Finish Carpentry
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection, Thermal Insulation, Vapor Retarders, Fire and Smoke Protection, Firestopping, Joint Protection, Preformed Joint Seals, Joint Fillers
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Wood Doors, Specialty Doors and Frames, Coiling Doors and Grilles, Panel Doors, Entrances and Storefronts, Automatic Entrances, Hardware, Door Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Tiling, Quarry Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Compartments and Cubicles, Partitions, Toilet, Bath, and Laundry Accessories
Division 12 - Furnishings

Division 12 - Furnishings

Casework, Furniture, Seating, Chairs
Division 13 - Special Construction

Division 13 - Special Construction

Special Facility Components, Fountains
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Scaffolding
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, Meters and Gages for Plumbing Piping, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Facility Sanitary Sewerage, Sanitary Waste and Vent Piping, Facility Storm Drainage, Facility Storm Drainage Piping, Plumbing Equipment, Domestic Water Filtration Equipment, Electric Domestic Water Heaters, Fuel-Fired Domestic Water Heaters, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Meters and Gages for HVAC Piping, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, HVAC Insulation, HVAC Piping and Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Air Duct Accessories, Flexible Ducts, Air Outlets and Inlets
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Identification for Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Facility Electrical Power Generating and Storing Equipment, Lighting, Interior Lighting, Exterior Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Special Foundations and Load-Bearing Elements, Special Foundations, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs and Gutters, Paving Specialties, Tactile Warning Surfacing, Planting
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Utility Structures, Water Utilities, Water Utility Distribution Piping, Storm Drainage Utilities, Culverts
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
291
Active Projects
166
Bidding Soon
2,326
All Active Projects
1,060
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 6, 2024

December 28, 2024

img_map_placeholder

Multiple Locations, Reading, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Berks Transit Center and 11Th Street Parking Renovation

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.