BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Braintree, Massachusetts. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

Project Location: 71 Cleveland Avenue, Department of Elder Affairs, Braintree, MA 02184. The scope of work for Base Bid includes construction of a bioretention basin, installation of storm drainage utilities (pipes, structures and chambers), installation of bioretention basin plantings and site restoration. This work includes all labor and materials associated with installation of the bioretention basin, storm drainages utilities, bioretention plantings and site restoration including but not limited to grading of site, removal of excess materials, compaction and cleanup of the site. Every request for such interpretation should be in writing (typed, not handwritten) addressed to Braintree Engineering Department, 85 Quincy Avenue, Braintree, Massachusetts 02184, Attention: Engineering Manager, or sent via email to rmatheson@braintreema.gov The required contract completion period for Base Bid is 120 consecutive days after issuance of Notice to Proceed. The estimated cost of this Base Bid is $250,000. The scope of work for Alternate Bid No. 1 includes demolition and reconstruction of the existing asphalt walkway surrounding the bioretention basin. This work includes all labor and materials associated with demolition and installation of an asphalt walkway. The required contract completion period for Alternate Bid No. 1 is 15 consecutive days in addition to the Base Bid contract completion. The estimated cost of this Alternate Bid No. 1 is $20,000 The scope of work for Alternate Bid No. 2 includes demolition and installation of new deep sump and hooded catch basin(s), with work to be performed if the existing structure is not suitable for reuse. This work includes all labor and materials associated with demolition and installation of new structure(s), including the structure(s) itself. The required contract completion period for Alternate Bid No. 2 is 10 consecutive days in addition to the Base Bid contract completion. The estimated cost of this Alternate Bid No. 2 is $20,000. Proposals must be submitted on the prescribed forms, enclosed in a sealed envelope bearing on the outside the bidder's name and address and "Bid for Elder Affairs Stormwater BMP, Contract No. SW24-2." and addressed to the Town of Braintree/Stormwater Department, Town of Braintree, 85 Quincy Avenue, Braintree, MA 02184. Bid Security in the form of a bid bond, cash, certified check, treasurer or cashier's check payable to the Owner, is required in the amount of five percent (5%) of the bid, in The Instructions to Bidders, Form of General Bid, Agreement, Plans, Specifications, Performance and Payment Bond, and other Contract Documents may be examined at the office of the Town Engineer, 85 Quincy Avenue, Braintree, Massachusetts 02184. The Selected Contractor Shall Furnish a Performance Bond and a Payment Bond in Amount at Least Equal to One Hundred Percent (100%) of the Contract Price as Stipulated in Section 00 72 00 General Conditions of These Specifications. The Owner's website may be updated, if necessary, with addenda, lists of a registered plan holders, reports and other information relevant to submitting a Bid for the Project. All official notifications, addenda and other Bidding Documents will be offered only through the Owner's website. Owner will not be responsible for Bidding Document, including addenda, if any, obtained from sources other than the Owner's website. Question Deadline 05/10/2024 at 4:00 PM ET Disadvantaged Business Enterprise (DBE) goals and Equal Employment Opportunity policies of the Town of Braintree are applicable to the total dollars paid to the construction contract. The goals for this project are a minimum of 4.2% D/MBE participation or $9,818 and a minimum of4.5% D/WBE participation or $10,519. All DBEs shall be certified by the Commonwealth of Massachusetts under the provisions certified by the Supplier Diversity Office (SDO). Note that these DBE amounts are goals, not strict requirements. For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents. By submission of a bid, the Bidder agrees that this bid shall be good and may not be withdrawn for a period of 30 days, Saturdays, Sundays and legal holidays excluded after the opening of bids. The Owner reserves the right to waive any informalities in bids and to reject any or all bids.

Bid Results

Water / Sewer

$275,000.00

Public - City

Paving, Site Work

12

12

2

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
531
Active Projects
329
Bidding Soon
4,119
All Active Projects
1,754
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

May 16, 2024

June 17, 2024

October 15, 2024

img_map_placeholder

71 Cleveland Ave, Braintree, MA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.