Site work for a transportation facility in Onida, South Dakota. Completed plans call for site work for a transportation facility.

Furnishing all equipment, labor, and materials as set forth in the specifications and performing all work, incidental thereto for Automated Weather Observing System (AWOS III-P), Onida Municipal Airport, Onida, South Dakota. Base Bid Primary Work: Approximately 2400 Ft of 1/C No. 4 Cu AWG, 600V, THWN-2, Installed in Conduit, 1200 Ft of 1/C No. 8 Cu AWG, 600V (GND), THWN-2, Installed in Conduit, 450 Ft of Trenching & Backfilling or Plowing for Conduit, 450 Ft of Non-Encased, Electrical Conduit, 1- Way, 2-Inch, Type I, Sch. 40 PVC in Trench or SDR 13 HDPE Plowed, 1 Each Cable Markers, 1 Each L-867B (12"), Class 1A, Junction Box with Flat Blank Steel Cover, AWOS III-P System, Complete and Commissioned, Temporary Phasing Work, Electrical, Demolition Work, Electrical, 1.5 Acre of Seeding and Fertilizing, 7200 SqYd of Mulching, and other items of related construction. Plans and Specifications may be obtained, at the Office of the latter, upon payment to Helms and Associates for shipping and handling in the amount of $100 for an 11" x 17" size set of plans and specifications. Additionally, upon request, in accordance with South Dakota Codified Law 5-18B-1, one copy of Plans and Specifications shall be furnished, without charge, to each Contractor resident in South Dakota who intends, in good faith, to bid upon the project. Bid Guarantee: Each bid must be accompanied by a certified check, cashier's check or draft in the amount of five percent (5%) of the total bid, and drawn on a solvent State or National Bank, or a ten percent (10%) Bid Bond issued by a surety authorized to do business in the State of South Dakota and payable to the City of Onida, South Dakota. Contract Bonds: Separate Payment and Performance Bonds guaranteeing faithful performance of the Contract and payment of all labor, materials, rentals, etc., will be required for an amount equal to one hundred percent (100%) of the amount of the Contract. All bonds must be issued or co-signed by a licensed resident agent of South Dakota. Commencement and Completion: The Engineer will set the beginning date in a written "Notice to Proceed with Construction". The Contractor shall begin the work within ten (10) days of the date set forth in the written "Notice to Proceed" and shall complete the work within the number of calendar days, working days, or completion date or dates as shown in the Specifications. Title VI: The City of Onida, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 USC 2000d to 2000d-4) and the Regulations, hereby notifies all bidders or offerors that it will affirmatively ensure that any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full and fair opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. Minimum Wage Rates: The successful bidder will be required to comply with all applicable Federal Labor Laws, including the minimum wage rates decision of the United States Department of Labor. Affirmative Action: A Contractor who may be awarded a contract of $10,000 or more and subcontractors who may be awarded a subcontract of $10,000 or more will be required to maintain an affirmative action program, the standards for which are contained in the advertised specifications. Award of Contract: The right is reserved, as the interest of the City of Onida, South Dakota, may require, to reject any and all bids, to waive informality in bids received, and to accept or reject any items of any bid, unless such bid is qualified by specific limitation. The contractor will certify that he and any of his subcontractors meet the requirements of 49 CFR, Part 29, regarding debarment, suspension, ineligibility and voluntary exclusion as further described in these specifications. The contractor will certify that he and his subcontractors will comply with the 49 CFR, 30.17, regarding Foreign Trade Restrictions as further noted in project specifications. The Contractor Will Certify That He and His Subcontractors Will Comply With "Buy American Certification (Jan. 1991)" as Further Noted in Project Specifications. The Contractor Will Comply With "Buy American-steel and Manufactured Products for Construction Contracts (Jan. 1991)" as Further Described in Project Specifications. If an applicant (corporation) has either unpaid Federal tax liability or has been convicted of a criminal violation under any Federal law within the preceding 24 months, the applicant is ineligible to receive an award unless the sponsor has received notification from the agency suspension and debarment official (SDO) that the SDO has considered suspension or debarment and determined that further action is not required to protect the Government's interests.

Award

Transportation Terminals

$283,961.00

Public - City

Site Work

28

11

4

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
4
Active Projects
3
Bidding Soon
25
All Active Projects
8
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 6, 2024

June 6, 2024

img_map_placeholder

18531 303rd Ave, Onida, SD

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.