BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 2, 2024 at 8:00 PM

Updated July 3, 2024

Demolition, site work, paving, outdoor lighting, renovation and addition to a mixed-use development in Saginaw, Michigan. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; for outdoor lighting for a sidewalk / parking lot; for the addition of a water / sewer project; for the demolition of a water / sewer project; for the renovation of a water / sewer project; and water / sewer project.

Project consists of the following: o A new Headworks Building with metering, sampling, screening, and grit removal, o Two (2) 55' diameter concrete primary clarifiers, o A primary sludge pump station/stormwater station with grinders, rotary lobe pumps, submersible pumps, o A new concrete 2.4 MG oxidation ditch with vertical aerators and a building, o A new 55' diameter concrete secondary digester tank with cover, gas handling equipment and an attached building. o Replacing a digester cover on an existing 35' diameter tank, handrails, existing building modifications and gas handling equipment, o An addition to the existing electrical building, o Replacement of final effluent and chlorinated effluent pumps, o Sludge handling facilities including a heat exchanger, boiler, grinders, sludge transfer pump, p o Piping, valves, gates, stairs, grating, manholes, catch basins, bypass pumping, hvac, o Electrical, instrumentation and controls, o Minor demolition and removals of existing piping, equipment and modifications to existing structures and buildings. o A new gas service and an electrical service upgrade from Consumers Energy, o Sitework including asphalt paving, concrete sidewalks, site lighting, grading and restoration. Site Address: 5790 W. Michigan Ave. Est. Completion Date: Sept. 14, 2026 Question Deadline 05/24/2024 All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. All questions or comments concerning plans and specifications are to be directed to Jean Inman, P.E., Spicer Group, Inc. at (989) 529-6067, via email at jeani@spicergroup.com.

Award

Water / Sewer

$24,572,000.00

Public - City

Addition, Demolition, Outdoor Lighting, Paving, Renovation, Site Work

97

37

9

12

Subscribe For Documents

42 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
212
Active Projects
58
Bidding Soon
1,553
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 3, 2024

August 6, 2024

Project location map

5790 W Michigan Ave, Saginaw, MI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.