Published July 29, 2024 at 8:00 PM

Updated July 30, 2024

Site work and paving for a mixed-use development in East St Paul, Manitoba. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

The Work to be done under the Contract shall generally consist of: (a) Tartan Way - Concrete Reconstruction Removal of existing asphalt and concrete pavement Excavation for pavement structure Installation of subdrains Subgrade compaction Supply and placement of geotextile fabric Supply and placement of sub-base Supply and placement of base course Construction of concrete pavement Landscaping, including areas disturbed during previously completed culvert lining project (b) Mowat Road - Asphalt Reconstruction Removal of existing asphalt pavement Excavation for pavement structure Subgrade compaction Supply and placement of sub-base Supply and placement of base course Construction of asphalt pavement and at approach and intersection tie-ins Landscaping Placement of base course at approaches (c) Gateway Road - Asphalt Surfacing Strip topsoil and organics from grade slopes and windrow for later replacement on the finished grade slopes Excavation for pavement structure common excavation material to be placed on grade slopes as shown in the drawings Excess material to be loaded, hauled, and stockpiled at the RM of East St. Paul's transfer station (4140 Birds Hill Road) Extend culverts Subgrade compaction Supply and placement of geotextile and geogrid Supply and placement of sub-base Supply and placement of base course Construction of asphalt pavement Construction of asphalt pavement tie-ins at Mulder Road, Pritchard Farm Road, and approaches Placement of base course on shoulders and at approaches Replace stripped topsoil on slopes and seed (hydro mulch) (d) Birds Hill Road Sidewalk - Sidewalk Renewal & Concrete Overlay Select sidewalk panel renewal (Elliot to Hoddinott) as shown on the drawings and as directed by the Engineer Supply and placement of base course Scarify existing concrete sidewalk (Elliot to Hillview) in preparation of concrete overlay Construct concrete overlay Landscaping Question Acceptance Deadline: 2024/05/03 12:00:00 PM CDT Official bid documents must be obtained from www.merx.com .

Under Construction

Roads / Highways

$2,131,470.00

Public - City

Paving, Site Work

18

5

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
85
Active Projects
48
Bidding Soon
537
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 10, 2024

June 10, 2024

Project location map

Multiple Locations, East St Paul, MB

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.