BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Springville, Utah. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

The Springville west side hatchery is upgrading the effluent piping system to protect the hatchery from Aquatic Invasive Species (AIS). New piping and infrastructure will be installed between the hatchery building and Spring Creek. The project will consist of installing a concrete discharge structure along the east bank of Spring Creek, a flow meter, a concrete collection box, a pipe head structure, approximately 690 feet of piping, and an electronic snail barrier. The new piping will be connected to existing effluent piping from the hatchery building, existing tank and raceway piping, and the collection and discharge structures. Removal of two concrete junction boxes and asphalt pavement will also be part of the project. The hatchery will be in operation during construction. There will be minimal downtime allowed for tie-overs to maintain fish health. Biosecurity measures shall be taken during construction to protect the hatchery. This shall include, but not be limited to equipment disinfection and inspections, and approval of imported earthen material sources.

Post-Bid

Roads / Highways

$300,000.00

Public - State/Provincial

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
57
Active Projects
31
Bidding Soon
502
All Active Projects
190
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 15, 2024

June 14, 2024

img_map_placeholder

1115 N Main St, Springville, UT

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.