Demolition, site work, paving and new construction of a bridge / tunnel in Ontonagon, Michigan. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
Porcupine Mountains Wilderness State Park - Replacement of Two Bridges, Ontonagon and Gogebic Counties, MI Porcupine Mountains Wilderness State Park 33303 Headquarters Road, Ontonagon, MI 49953 The Michigan DNR requests professional services to design the removal and replacement of two trail bridges and the bridge approaches. Services desired include providing hydraulic analyses, inspection of existing structures, load rating of existing structures, topographic surveying, boundary surveying, site surveying, and installing soil borings for two trail bridges at the Porcupine Mountains Wilderness State Park. Both bridges are park-internal (non-public) vehicular bridges. One is an approximately 42' long x 16' wide bridge over the Union River, which carries a groomed cross country ski trail, and the other is a 35' long x 8' wide bridge over a tributary to Sahwa Creek, which provides pedestrian and park vehicle access to a rental cabin. Union River Bridge (Bridge B-5) information: Located in Carp Lake Township, Ontonagon County, Michigan. Existing bridge is in poor condition due to significant deterioration of the timber, abutments are nearing the end of their lifespan, and total bridge replacement is recommended. Adjacent land is owned by MDNR Parks and Recreation Division There is no existing topographic survey, geotechnical investigation, and H&H model/report available for this bridge. Soil borings shall provide assurance of bank stability above stream channel. Topographic survey, hydraulic analysis, and geotechnical investigation shall be complete by 8/1/2024. Cotten Cabin Bridge (Bridge B-32) information: Located in Wakefield Township, Gogebic County, Michigan. Existing bridge is in poor condition due to significant deterioration of the timber, abutments are nearing the end of their lifespan, and total bridge replacement is recommended. Adjacent land is owned by MDNR Parks and Recreation Division There is no existing topographic survey, geotechnical investigation, and H & H model / report available for this bridge. Soil borings shall provide assurance of bank stability above stream channel. Topographic survey, hydraulic analysis and geotechnical investigation shall be complete by 08/01/2024. Site visit: Photos on the cover or within each proposal will make it clear if the sites were visited. MDNR wishes to have Phase 500 design completed by Dec. 1, 2024. Please provide a detailed design schedule (including key tasks and milestone dates) with the PSC Proposal Question: Please do not submit online questions. ALL questions should be emailed to Tom Pawlowski at pawlowskit@michigan.gov address no later than 2:00 p.m., Eastern on Friday, May 17, 2024
Award
Bridges / Tunnels
$500,000.00
Public - State/Provincial
Demolition, New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 23, 2024
June 24, 2024
33303 Headquarters Rd, Ontonagon, MI
Related To This Project
Ontonagon, MI
Bid Date: May 07 2024
Ontonagon, MI
Bid Date: Jun 06 2024
Ontonagon, MI
Bid Date: Jun 24 2024
Ontonagon, MI
--
Ontonagon, MI
Bid Date: Aug 08 2024
Ontonagon, MI
Bid Date: Aug 14 2024
Ontonagon, MI
Bid Date: Aug 15 2024
Ontonagon, MI
Bid Date: Mar 22 2024
Ontonagon, MI
Bid Date: Mar 19 2024
Ontonagon, MI
Bid Date: Feb 14 2024
Ontonagon, MI
Bid Date: Dec 13 2023
Ontonagon, MI
Bid Date: Jan 05 2024
Ontonagon, MI
Bid Date: Feb 23 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.