Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Demolition, remodeling and renovation of a military facility in San Diego, California. Completed plans call for the remodel of a military facility.
PROJECT DESCRIPTION This project provides improvements to Building 2258 Rooms 121 through 130 and Rooms 143 through 147: DEMOLITION (reference general requirements for any additional information associated with section). Renovation: 3.1 Remove existing wall approximately 230 SF (room 126). 3.2 Remove approximately 2 existing door jambs and doors (rooms 124 and 125). 3.3 Remove existing roll up cage (rooms 143 and 145). 3.4 Remove existing cove base throughout project areas approximately 900 LF 3.5 Remove existing carpet squares throughout project areas approximately 3700 SF 3.6 Remove existing floor electrical boxes approximately 9 boxes (rooms 126 and 126A) 3.7 Remove approximately 1 cabinet (room 145) 3.8 Remove existing lighting throughout project areas approximately 55 (2x4 fixtures) and 25 (2x2 fixtures) 3.9 Remove existing acoustic ceiling tiles throughout project area approximately 3700 SF. 3.10 Clean up continuous daily throughout project areas. CONSTRUCTION (reference general requirements for any additional information associated with section). Renovation: 4.1 Install new electrical approximately 4 new drops (new kitchenette area room 143) 4.2 Install approximately 3 new door jambs and doors w/ hardware (rooms 124,125 &143) 4.3 Install new walls approximately 370 SF (rooms 143 and 145) 4.4 Paint walls throughout project areas approximately 9100 SF 4.5 Install new cabinets approximately 30 LF (lower and uppers new kitchenette area room 143) 4.6 Install new countertop approximately 15 LF (new kitchenette area room 143) 4.7 Install new lock sets throughout project areas approximately 9 locksets 4.8 Install new cypher locks approximately 3 (entries for rooms 143, 146 and 147) 4.9 Install new window screens on exterior windows approximately 8 screens 4.10 Install new LVT flooring throughout project areas approximately 3700 SF 4.11 Install new cove base throughout project areas approximately 900 LF 4.12 Install new exterior concrete flatwork approximately 480 SF 4.13 Install new interior windows for natural lighting (rooms 124,125 &145) 4.14 Install new LED lighting throughout office spaces approximately 55 (2x4 fixtures) and 25 (2x2 fixtures) 4.15 Install new acoustic ceiling tiles throughout project area approximately 3700 SF 4.16 Clean up entire project and de-mobilize for end user to have turnkey usage. Tint: 3.1 Remove approximately 2200 S.F. of existing window tint off of approximately 183 window and door panels. Clean up continuous every day due to high volume of visitors at the building. Daily. Tint: 4.1 Replace approximately 2200 S.F. of new window tint on approximately 183 window and door panels. 4.2 Clean up continuous every day due to high volume of visitors at the building. Daily. The project is subject to prevailing wage and the Buy American Act. This is a Project by Description NO Design will be developed. Addendum 1 was issued 5-13-2024.
Post-Bid
Military
$1,000,000.00
Public - Federal
Demolition, Remodeling, Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 16, 2024
June 17, 2024
9175 Boyington Rd, San Diego, CA
Related To This Project
San Diego, CA
Bid Date: Jul 17 2024
San Diego, CA
Bid Date: Nov 17 2021
San Diego, CA
Bid Date: Jun 11 2021
San Diego, CA
Bid Date: Jan 07 2021
San Diego, CA
Bid Date: May 23 2024
San Diego, CA
Bid Date: Apr 07 2021
San Diego, CA
Bid Date: Jan 09 2025
San Diego, CA
Bid Date: May 15 2024
San Diego, CA
Bid Date: Mar 19 2019
San Diego, CA
Bid Date: May 06 2024
San Diego, CA
Bid Date: May 10 2024
San Diego, CA
Bid Date: Nov 13 2024
San Diego, CA
Bid Date: Jun 07 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.