Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published April 18, 2026 at 8:00 PM
Updated May 20, 2026
Renovation of a clubhouse / community center in Eatonville, Washington. Conceptual plans call for the renovation of a clubhouse / community center.
Work to Be Performed Includes: The Provision and Installation of a Generator and Automatic Transfer Switch (Ats). The Work Includes All Equipment, Materials, and Labor to Install the Generator and Ats Including, Generator, Ats, Generator Equipment Pad; Main Service Switchboard; Electrical; and Surface and Building Restoration. Each Bid Proposal Shall Be Accompanied by a Bid Proposal Deposit in Cash, Certified Check, Cashier's Check, Postal Money Order, or Surety Bond in an Amount Equal to at Least 5 Percent of the Amount of Such Bid Proposal. Make Checks Payable to the Town of Eatonville. Should the Successful Bidder Fail to Enter Into Such Contract and Furnish Satisfactory Performance and Payment Bond Within the Time Stated in the Specifications, the Bid Proposal Deposit Shall Be Forfeited to the Town of Eatonville. The Town of Eatonville Reserves the Right to Reject Any or All Bids and to Waive Irregularities in the Bid or the Bidding. No Bidder May Withdraw Their Proposal After the Hours Set for the Opening Thereof, or Before Award of Contract, Unless Said Award is Delayed for a Period Exceeding 60 Calendar Days. The Town of Eatonville Hereby Notifies All Bidders That It Will Affirmatively Ensure That in Any Contract Entered Into, Pursuant to This Advertisement, Minority and Women's Business Enterprises Will Be Afforded Full Opportunity to Submit Bids in Response to the Invitation and Will Not Be Discriminated Against on the Grounds of Race, Color, National Origin, or Sex in Consideration for an Award. The Town of Eatonville is an Equal Opportunity and Affirmative Action Employer. All Work Performed on the Project Will Be Subject to State Prevailing Wage Rates. The method of Contractor Selection has not been Determined at this time. A Voluntary Pre-bid Walkthrough of the Project Will Be Held on Wednesday, April 15, 2026 at 1:00 Pm. The Walkthrough Will Meet at the Community Center Site (305 Center Street West., Eatonville, Wa 98328).
Conceptual
Clubhouse / Community Centers
$615,000.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 23, 2027
305 Center St W, Eatonville, WA
Related To This Project
Eatonville, WA
Bid Date: Jun 18 2024
Eatonville, WA
Bid Date: Sep 05 2024
Eatonville, WA
Bid Date: Dec 03 2024
Eatonville, WA
Bid Date: Dec 18 2024
Eatonville, WA
Bid Date: May 01 2025
Eatonville, WA
Bid Date: May 13 2025
Eatonville, WA
Bid Date: Jun 24 2025
Eatonville, WA
Bid Date: Sep 03 2025
Eatonville, WA
Bid Date: May 16 2024
Eatonville, WA
Bid Date: Mar 03 2022
Eatonville, WA
Bid Date: Feb 09 2022
Eatonville, WA
Bid Date: Apr 26 2023
Eatonville, WA
Bid Date: Feb 15 2023
Eatonville, WA
Bid Date: Dec 21 2022
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
