BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Danvers, Massachusetts. Completed plans call for site work for a playground / park / athletic field; road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

The Project consists of: Removal and replacement of Asphalt surfaces including full depth reconstruction, asphalt paving parking lot, parking lot striping, asphalt walkway reconstruction, installing new bollards, installing drainage pipe, manholes & catch basins, and any other work as shown on the drawings. Two alternates are included; #1 includes reconstructing the Federal Housing Authority property portion of the lot with new asphalt, concrete dumpster pad, and dumpster fence. Alternate 2 includes milling and overlaying the asphalt driveway & basketball court reconstruction. Alternate #1: Reconstruction of the abutting property portion of the parking lot referred to as the Federal Housing Authority portion; Removal and replacement of asphalt surfaces including full depth reconstruction, demolition & disposal of subgrade, importing gravel roadway base, parking lot striping, concrete dumpster pad, black chain link privacy fence and double gate, and any other work as shown on the drawings. Alternate #2: Removal and replacement of the existing basketball court, demolition & disposal of subgrade, importing gravel roadway base, paving new basketball asphalt surface, high friction basketball surface coating, installation of court layout in colors chosen by owner, reuse of existing hoop, loom & hydroseed, and milling & overlaying the driveway, bollards, plants, and any other work as shown on the drawings. Location- 10 Water Street Danvers, MA 01923 The work is estimated to cost $250,000. The participation goals for this project shall be 15.3% for minorities and 6.9% for women. Question Deadline 05/22/2024 Bidders requiring clarification or interpretation of the Contract Documents shall make a written request to the Architect. The Architect will answer such requests if received seven (7) calendar days before the date for receipt of the bids. Completion- 120 consecutive calendar days

Bid Results

Roads / Highways

$138,975.00

Public - City

Paving, Site Work

7

13

4

5

Subscribe For Documents

34 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
310
Active Projects
199
Bidding Soon
2,475
All Active Projects
1,119
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 29, 2024

June 28, 2024

img_map_placeholder

10 Water St, Danvers, MA

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.