Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 20, 2025 at 8:00 PM
Updated August 21, 2025
Site work, paving, new construction and renovation of a mixed-use development in Danvers, Massachusetts. Working plans call for the construction of a 5,400-square-foot parking garage; for site work for a parking garage; communication facility; water / sewer project; sidewalk / parking lot; for paving for a sidewalk / parking lot; and for the renovation of a library.
Project Scope The proposed Danvers Logan Express will provide bus transportation for local travelers going to and from Boston Logan International Airport. The proposed Danvers Logan Express project includes reconfiguring existing parking lots and constructing a new approximately 5,400 square-foot building located at the Liberty Tree Mall. Site work will include the installation of long-term and short-term parking lots, a bus lane, a pick-up/drop-off area, walkways, curb cuts, utilities for the new building, stormwater infrastructure, rehabilitating areas near wetlands, landscaping and various other site improvements. Utility scope of work will include electrical, sewer, water, and communications for the parking lots and building. The long-term parking area will include approximately 527 parking spaces, while the short-term parking area adjacent to the building will include approximately 20 parking spaces. The new ground-up building will house a public waiting area lobby, ticketing office, managers office, break room, restrooms and support spaces. Currently, a temporary Danvers Logan Express operates out of this property.As part of this project, a permanent facility will be constructed to transition from this existing temporary facility.The proposed construction of the long-term parking will be phased to enable continuous operation of the facility throughout construction. The Method of Contractor Selection Has Not Been Determined at This Time. Shortlist confirmed Estimated Construction Cost : the Cost of Construction is Estimated by Massport at Approximately Seventeen Million Dollars ($17,000,000). Deadline for Submission of Written Questions Thursday, February 13, 2025 Official Answers Published by Mpa Thursday, February 20, 2025 Begin Construction Summer 2025 Substantial Completion Winter 2027 Qualification Submittals are being requested from trade contractors capable of performing the following classes of work: o Roofing & Flashing (070002, 071050, 075019, 075416, 075556, 076200) o Tile (090002, 093000) o Acoustical Tile (090003, 095100, 095130) o Resilient Flooring (090005, 096510) o Terrazzo (090006,096620) o Painting (090007, 099000) o Fire Protection (210000) o Plumbing (220000) o HVAC (230000) o Electrical (260000, 260001, 260543, 260573, 262200,262416,264313, 270000, 270100, 270526, 270528, 270529, 270536, 271000, 275116, 283100, 282000, 284621.11) o Interior Glass and Glazing (080002, 081210, 088010) Site work has been engineered by HNTB Corporation (HNTB). Through a phased approach, temporary facilities will gradually be replaced by permanent facilities, revenue control, and other infrastructure. New work must be phased to maintain the continuous operation of a temporary Logan Express facility within the same general project area. A minimum number of parking spaces (subject to coordination with the Massachusetts Port Authority) must be available and accessible throughout construction. In order to meet these requirements, construction documents will illustrate proposed phasing of new work. Portions of the existing parking lot will be closed off to allow for the phased site work to be constructed. The lot will be expanded, with additional pavement and parking spaces added. In order to mitigate any increase in impervious surface, associated stormwater management will be installed. Utility work, including sanitary and electrical connections, will be upgraded in preparation of the final condition. When completed, the lot will have revenue control gates, and an additional curb cut for emergency vehicles. The electrical, communications, and water connections will generally be served by the existing available private connections for the mall property. The sanitary connection for the building will go to Ash Street via force main as there is no close available connection from the mall property. The force connection allows the entirety of the connection to be built within the property limits. A grinder pump will lift the sanitary waste to Ash Street and connect to a sewer manhole on the property before connecting by gravity to a Town sewer manhole on Ash Street. Lighting infrastructure will be installed throughout the parking lot to provide for proper lighting levels. Electric Vehicle Ready Parking Spaces will be installed in both the long-term and short-term parking lots. The total estimated cost of the Project is approximately $17,000,000
Final Planning
Library
$17,000,000.00
Public - State/Provincial
New Construction, Paving, Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 26, 2025
September 29, 2025
100 Independence Way, Danvers, MA
Related To This Project
Danvers, MA
Bid Date: May 22 2024
Danvers, MA
Bid Date: Jun 12 2024
Danvers, MA
Bid Date: May 30 2024
Danvers, MA
Bid Date: Jun 20 2024
Danvers, MA
Bid Date: May 30 2024
Danvers, MA
Bid Date: Jun 12 2024
Danvers, MA
Bid Date: Jun 13 2024
Danvers, MA
Bid Date: Jun 20 2024
Danvers, MA
Bid Date: May 23 2024
Danvers, MA
Bid Date: May 29 2024
Danvers, MA
Bid Date: May 02 2024
Danvers, MA
Bid Date: May 02 2024
Danvers, MA
Bid Date: May 23 2024
Danvers, MA
Bid Date: May 01 2024
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
